Shindaiwa Limited
POWERCENTER 15
Four Ashes, Wolverhampton, UK
PC15-OM-Vs: 1
T: +44 (0)1902 791855
<Note>
Procedures except for pre-operation inspection must be performed by specialized
technicians.
Items indicated by
: Contact the retail outlet where the equipment was purchased.
Always be sure to use genuine parts when replacing parts.
When removing waste liquid from the equipment, place some container to collect the
liquid and prevent it from spilling on the ground. Dispose of such oil, fuel, cooling water
(LLC), filters, batteries and other harmful substances as industrial waste in accordance
with applicable laws and regulations. Consult with the retail outlet where the equipment
was purchased if you have any inquiries regarding proper disposal.
When performing maintenance with doors or covers open, be sure that no other persons
can accidentally come close to the equipment. Close all doors and covers if momentarily
leaving the equipment unattended.
Perform periodic inspection and maintenance as indicated by the table below in order to ensure
that this equipment can be operated in optimal condition.
Use the hour meter as a general indicator for the operating time.
Inspection Item
Daily
Inspection Period
50
hours
Every
100
hours
Every
200
hours
Every
400
hours
Every
1,000
hours
Every
2,000
hours
1
Inspect/Add Fuel
○
2
Inspect/Add Engine Oil
○
3
Change Engine Oil
1st
time
○
2nd time
and after
○
4
Change Oil Filter
1st
time
○
2nd time
and after
○
5
Inspect/Add Cooling
Water
○
6
Change Cooling Water
○
Or
2years
7
Clean Fuel Strainer
1st
time
○
2nd time
and after
○
8
Replace Fuel Element
○
9
Drain Water from/Clean
Fuel Tank
○
10
Inspect for
Fuel/Oil/Cooling Water
Leakage
○
11
Inspect/Add Battery Fluid
○
12
Clean Air Element
1st
time
○
2nd time
and after
○
13
Replace Air Element
○
14
Drain Liquid from Spill
Containment
○
-35-