11
Before you start
Loop handle assembly
1.
Assemble the front handle (A) and bracket (B) on the shaft
tube (C) loosely.
2.
Adjust the location of the front handle to a convenient posi-
tion.
3.
Tighten the screws (M5×35) (D) and nuts (E) securely. - One
of the 4 screws must be tighten together with the hanger (F)
as illustrated.
Shoulder harness
1.
Suit the length of knapsack band to comfort.
2.
As the strap is elastic and adjustable, it is preferable to con-
nect the strap (A) to the hangers (B) located on the front han-
dle (C) and the left or right knapsack band to maintain a
fatigueless and comfortable operation.
Installation of shield
1.
Fit shield (A) to mounting portion of angle transmission and
tighten 4 bolts (B).
Installing nylon line cutting head
1.
Insert locking tool (A) into a hole located on the right side of
angle transmission while forcing retainer spring to the left
side.
2.
Insert locking tool further into blade retainer fixing slot (B) to
fix output shaft.
3.
Using the socket wrench, remove the nut (C), cup (D), and
lower blade retainer (E).
Nut, cup, and lower blade retainer are not used with a nylon
line cutting head.
Summary of Contents for BP510S
Page 2: ...2 ...
Page 67: ...33 X750 026920 X750222 7601 2015 1Remarques et dos de couverture NOTES ...
Page 68: ...34 X750 026920 X750222 7601 2015 NOTES ...
Page 69: ...35 X750 026920 X750222 7601 2015 NOTES ...
Page 135: ...3 ...