background image

 

            ZEBV-5084A

 

16 

Item 

Condition 

Required item 

*  refers  to  Shimadzu 

part number

 

Check 

 

Power capacity 

For  iMScope 

TRIO 
 
 
 
 
 
 
 

For PC, Monitor 

 
 

Ground 

(ground resistor) 

 

AC230V 20A 50/60Hz 

*Avoid  sharing  power  source  with 
other equipment. 

AC100V 15A 50/60Hz 

*In the country where power supply 
voltage  is  not  AC100V,  use  a 
step-down  transformer  on  the 
AC100V power-supply line. 

 

Depends on configuration 

*Use a power supply equipped with a 

ground fault interrupter. 

Less than 100 ohms

 

 

Step down transformer : 

STEP-DOWN 
TRANSFORMER 
1.5KVA 
P/N 225-25315-41

(Depending on the situation) 

Power  plug  for  Step 
Down transformer 

Extension  cable  for 

100V line 

□ 

 

Terminals 

For  iMScope 

TRIO 
 

For PC, Monitor 

 

AC230V

  10m 

  AC100V

  2.5m 

 

Depends on configuration 

 

(Depending on the situation) 

3-point  power  plug  for 
230V 

 

Power  strip  for  PC, 

Monitor 

□ 

4.Gas 

N

(nitrogen gas) 

Purity 

Supply  pressure 

to iMScope TRIO 

Distance  from 

gas supply source 

 

99% or greater 

    (In  case  of  nitrogen  gas  generator 

97.0 % or greater) 

690

800kPa 

 

Must be within 5m from the center 
of instrument rear. (Use 5m pipes.) 

 

If using gas cylinders

 

Gas  cylinder  (47L 

cylinder 

is 

recommended ) 

Securing  means  such 

as a gas cylinder holder 

(for 

two 

cylinder 

including      spare 
cylinder) 

Handle  for  opening 

and  closing  the  gas 
cylinder  (if  the  gas 
cylinder  does  not  have   
a handle) 

Pressure  regulator

PPR-N2 
P/N 221-35999-01

Pipes

  Gas  supply 

tube, external 

  P/N 225-09933-91

*

 

If  supplying  gas 

generated  from  liquid 
nitrogen

 

Supply  through  PTFE 

pipe  with  an  outer 
diameter  of  6mm  and 
an  inner  diameter  of 
4mm or larger. 

□ 

 

Ar (argon gas) 

Purity 

Supply  pressure 

to iMScope TRIO 

 

99.99% or greater 

200

500kPa 

 

If using gas cylinders

 

Gas  cylinder  (  3  -  47L 

cylinder 

is 

recommended ) 

□ 

Summary of Contents for iMScope TRIO

Page 1: ...ZEBV 5084A Imaging Mass Microscope iMScope TRIO Pre Installation Requirements Installation Preparations Confirmation...

Page 2: ...on Copyright 2014 Shimadzu Corporation 2 Information in this manual is subject to change without notice and does not represent a commitment on the part of the vendor 3 Any errors or omissions which ma...

Page 3: ...t requirements 6 2 4 Required power supply 6 2 5 Gas 7 2 5 1 Nitrogen gas 7 2 5 2 Argon gas 9 2 5 3 General precautions 9 2 5 4 Precautions when using high pressure gas cylinder 10 2 6 Exhaust 10 2 7...

Page 4: ...reparation required at the customer s site in order to facilitate installation of the iMScope TRIO Please make sure that the content of this document is carefully observed to ensure that the instrumen...

Page 5: ...crane prepare an approach route and the stopping place of the crane and the carry in entrance to the building Passage and the corners in the building should have the sufficient width and height to mov...

Page 6: ...space for maintenance Place equipment that can be readily moved such as the PC system given in the example to the left of the iMScope TRIO unit and ensure a space of 60cm or more between the iMScope...

Page 7: ...on of this instrument must be at least 2 3 m high Including space for working provide a W4 m D3 m H2 3 m site Ventilation This instrument uses flammable solvents for auto tuning and uses large amounts...

Page 8: ...refers to the Shimadzu Corporation part number If power supplies of the above specifications are not available alterations to room power supply capacity will be necessary Required power supplies for e...

Page 9: ...es and pressures Gas Pressure supplied to iMScope TRIO Type Purity Nitrogen gas N2 99 or greater In case of nitrogen gas generator 97 0 or greater 690 800kPa Argon gas A 99 99 or greater 200 500kPa 2...

Page 10: ...Prepare the following pressure regulator and pipes given below or equivalent products if using a nitrogen gas cylinder Pressure regulator Part number Description Requirement Remarks 221 35999 01 Press...

Page 11: ...en supplying gas by centered gas supply as other instruments being used may be affected by the amount of gas supplied If using a cylinder please use 5m or shorter pipes in general carrier gas piping I...

Page 12: ...e Draft chamber 20m3 min Be sure to install the oil return kit to suppress the decrease in oil in the rotary pump and clean the exhaust gas from a rotary pump The parts which are require for the exhau...

Page 13: ...a draft chamber during the process of spray coating of the matrix to prevent dispersion of the spray solution of the matrix Dustproof Gasproof mask We recommend you use a Dustproof Gasproof mask duri...

Page 14: ...ce For measuring the matrix Pipette and pipette tips 100 1000uL Matrix solvent HPLC grade methanol This is also used for cleaning airbrush Milli Q ultrapure water TFA Vortex mixer For agitating the ma...

Page 15: ...the following pages are a checklist for each of the installation conditions that have been described in this document Please fill out the checklist yourself and pass it on to the appropriate personnel...

Page 16: ...Screen to avoid direct contact with airflows from air conditioners Humidity 40 to 70 with no condensation Installation space Space for iMScope TRIO Strength Portable table for PC and monitor Stand fo...

Page 17: ...e situation 3 point power plug for 230V Power strip for PC Monitor 4 Gas N2 nitrogen gas Purity Supply pressure to iMScope TRIO Distance from gas supply source 99 or greater In case of nitrogen gas ge...

Page 18: ...us Adjustment acceptance Standard samples for instrument adjustment and sensitivity check are required CD R Blank for installation data record is required TFANa 200mL P N 225 06613 08 Standard sample...

Page 19: ...cable Strait 2pc Others Consumable parts Multimeter is required to distinguish which is the right side of the ITO coated glass slide ITO coated microscope slides and air duster are consumed regularly...

Page 20: ...hen affixing the sample Because of the instrument composition we can not analyze that part c Section Thickness To avoid the section damage and the instrument trouble we ask you to slice the tissue wit...

Page 21: ...al Cutting Temperature compound causes sensitivity decline because the polymer adherents to the sections If you cannot avoid using OCT we ask you to make sections outside the OCT as well If you wish t...

Reviews: