Pre-Installation Requirements 

Installation Preparations/Confirmation

 

 
 
 
 
 

 

 
 
 
 
 
 
 
 
 
 
 

 

Summary of Contents for iMScope TRIO

Page 1: ...ZEBV 5084A Imaging Mass Microscope iMScope TRIO Pre Installation Requirements Installation Preparations Confirmation...

Page 2: ...on Copyright 2014 Shimadzu Corporation 2 Information in this manual is subject to change without notice and does not represent a commitment on the part of the vendor 3 Any errors or omissions which ma...

Page 3: ...t requirements 6 2 4 Required power supply 6 2 5 Gas 7 2 5 1 Nitrogen gas 7 2 5 2 Argon gas 9 2 5 3 General precautions 9 2 5 4 Precautions when using high pressure gas cylinder 10 2 6 Exhaust 10 2 7...

Page 4: ...reparation required at the customer s site in order to facilitate installation of the iMScope TRIO Please make sure that the content of this document is carefully observed to ensure that the instrumen...

Page 5: ...crane prepare an approach route and the stopping place of the crane and the carry in entrance to the building Passage and the corners in the building should have the sufficient width and height to mov...

Page 6: ...space for maintenance Place equipment that can be readily moved such as the PC system given in the example to the left of the iMScope TRIO unit and ensure a space of 60cm or more between the iMScope...

Page 7: ...on of this instrument must be at least 2 3 m high Including space for working provide a W4 m D3 m H2 3 m site Ventilation This instrument uses flammable solvents for auto tuning and uses large amounts...

Page 8: ...refers to the Shimadzu Corporation part number If power supplies of the above specifications are not available alterations to room power supply capacity will be necessary Required power supplies for e...

Page 9: ...es and pressures Gas Pressure supplied to iMScope TRIO Type Purity Nitrogen gas N2 99 or greater In case of nitrogen gas generator 97 0 or greater 690 800kPa Argon gas A 99 99 or greater 200 500kPa 2...

Page 10: ...Prepare the following pressure regulator and pipes given below or equivalent products if using a nitrogen gas cylinder Pressure regulator Part number Description Requirement Remarks 221 35999 01 Press...

Page 11: ...en supplying gas by centered gas supply as other instruments being used may be affected by the amount of gas supplied If using a cylinder please use 5m or shorter pipes in general carrier gas piping I...

Page 12: ...e Draft chamber 20m3 min Be sure to install the oil return kit to suppress the decrease in oil in the rotary pump and clean the exhaust gas from a rotary pump The parts which are require for the exhau...

Page 13: ...a draft chamber during the process of spray coating of the matrix to prevent dispersion of the spray solution of the matrix Dustproof Gasproof mask We recommend you use a Dustproof Gasproof mask duri...

Page 14: ...ce For measuring the matrix Pipette and pipette tips 100 1000uL Matrix solvent HPLC grade methanol This is also used for cleaning airbrush Milli Q ultrapure water TFA Vortex mixer For agitating the ma...

Page 15: ...the following pages are a checklist for each of the installation conditions that have been described in this document Please fill out the checklist yourself and pass it on to the appropriate personnel...

Page 16: ...Screen to avoid direct contact with airflows from air conditioners Humidity 40 to 70 with no condensation Installation space Space for iMScope TRIO Strength Portable table for PC and monitor Stand fo...

Page 17: ...e situation 3 point power plug for 230V Power strip for PC Monitor 4 Gas N2 nitrogen gas Purity Supply pressure to iMScope TRIO Distance from gas supply source 99 or greater In case of nitrogen gas ge...

Page 18: ...us Adjustment acceptance Standard samples for instrument adjustment and sensitivity check are required CD R Blank for installation data record is required TFANa 200mL P N 225 06613 08 Standard sample...

Page 19: ...cable Strait 2pc Others Consumable parts Multimeter is required to distinguish which is the right side of the ITO coated glass slide ITO coated microscope slides and air duster are consumed regularly...

Page 20: ...hen affixing the sample Because of the instrument composition we can not analyze that part c Section Thickness To avoid the section damage and the instrument trouble we ask you to slice the tissue wit...

Page 21: ...al Cutting Temperature compound causes sensitivity decline because the polymer adherents to the sections If you cannot avoid using OCT we ask you to make sections outside the OCT as well If you wish t...