
SPB-500 Safety & Operating Instructions
Sherpa Tools | SPB-500 | 2018
5
Step 8
: Obtain the tray and 4 sets of bolts and nuts (
Figure 16-1
), fasten it to the tray rack
like it is shown in
Figure 16-2
.
Bolt: M8*P1.25*L45mm x 4
Nut: M8*P1.25*t11mm x 4
IMPORTANT
: At this point, it is very important to make sure that the wires run down the tube
DO NOT interfere
with the tray or get between the tubes. If you do, please redo the wiring as
shown in
Figure 17-1
and
17-2
.
Figure 14
Figure 15-1
Figure 15-2
Figure 15-3
Figure 16-1
Figure 16-2
Figure 17-1
Figure 17-2
Figure 13