
SPB-500 Safety & Operating Instructions
Sherpa Tools | SPB-500 | 2018
3
Step 3
: Now turn the handle into the correct orientation. Insert the tubes on both sides. Use
hex bolts and nuts (
Figure 7
) for fastening (
Figure 8
). Your wheelbarrow should now
look like
Figure 9
. Wrench size.
Bolt: M8*P1.25*45mm x 2
Nut: M8*P1.25*t11mm x 2
Step 4
: Take out the speed controller that has been pre-connected to the front wheel from the
battery container. You may find that the brake has been installed on one side of the
handles. Fasten the speed controller to the other handle (
Figure 10
).
NOTE: Ensure the speed controller unit is pushed against the handle grip
(Figure10.1).
Any gap between the speed controller and grip may lead to a reduction
in speed control, slower operating speeds or failure to operate.
Figure 5
Figure 6
Figure 7
Figure 8
Figure 9
Figure 10
Figure 10.1