
EIA2000 VOIP gateway USER MANUAL
EIA2000 VOIP gateway USER MANUAL
8
In addition, connect to ground correctly will reduce the level
of damage to surge pressure caused by lightning. Please take
measures as follows:
LED Name
Status
Color
System run normally
0.1second on , off ,flash swiftly(system
run normally, the internet have connected
to calling control center )
On in 1.5 second, off. Flash swiftly
(system run normally ,the internet
connecting to calling control enter
stopped)
RUN
Status
Off (the system is breakdown)
LINK light off ( the Ethernet connecting is
breakdown)
LINK light green (The Ethernet
connecting is normal)
10Base-T
The Ethernet
port status of
10Base-T
SPEED shift (The Ethernet is used to
sending packages)
Off (Phone is hanged up )
CHANNEL
LED 1 – 16
Voice channel
status
Green(Phone is unused)
(
1
)
Insure all power supply devices in building connect
ground correctly conform to clause 250 in NEC(National
Electric Code)manual.
(
2
)
Insure the copper line connecting the panel of power
supply and ground line is high quality. The standard of
copper conform to Clause 250 sect 94/95 in NEC
Manual .Connecting ground cable is concluding one
connecting ground line or several connecting ground
line together under construction 2.44m deep or one line
around and under the construction at least 0.76m deep
(see clause 250 sect 94/95 in NEC)
(
3
)
Install safeguard against surge pressure between
EIA2000 device and point connecting ground .Other
computer device such as terminal or printer,connecting
to EIA2000,ought to connect safeguard too. Configure
the safeguard against surge pressure correct according
the specific device connected.
2.3 LED light
Following is the specification of LED light on the back of
EIA2000
7