background image

05_10B163_0E

Page 6

2b. ASSemBle end And mIddle RIBS (20 FT. HIGH):

DETAIL B

End Ribs

DETAIL C

Middle Ribs

Assemble end and middle ribs as shown in Detail B and Detail C. 

Securely fasten all of the joints with the hardware indicated.

800384

800384

800386

800386

800385

800438

800435

800385

800438

800435

800383

800384

800384

800386

800386

800385

800438

800436

800385

800438

800436

800383

800389

800390

800389

800390

800391

800391

20 

FT.

 HIGH

model onlY

See previous page

for 16ft. high model

#11131

2 3/4" Bolt 

All Connections

800859

800436

00690

11131

800859

800859

Summary of Contents for Peak Style Shelter Frame

Page 1: ...ilding Allow approximately 15 minutes for every foot in building length Please read instructions COMPLETELY before assembly This shelter MUST be securely anchored THIS IS A TEMPORARY STRUCTURE AND NOT RECOMMENDED AS A PERMANENT STRUCTURE 1 800 524 9970 1 800 559 6175 Canada Recommended Tools 8 27 10 150 Callender Road Watertown CT 06795 www shelterlogic com FOR SIZES 30 W x 16 H 30 W x 20 H ...

Page 2: ...lterLogic LLC Shelters offer storage and protection from damage caused by sun light rain tree sap animal bird excrement and light snow Please anchor this ShelterLogic LLC structure properly See manual for more anchoring details Proper anchoring keeping cover tight and free of snow and debris is the responsibility of the consumer Please read and understand the installation detail warnings and cauti...

Page 3: ...RUSS BRACE 38X828X1 2T 32 5 8 H H GRY 800391 8 TRUSS BRACE SWG 38X1866 7X1 2T 71 3 16 H H 800390 9 UPRIGHT 60X1949 5X2 6T SWG 3H GRY 800436 10 CROSS RAIL SWEDGED 50 1 2 X 1 3 8 DIA 11102 11 CROSS RAIL PLAIN END 2H 48 1 2 X1 3 8 11104 12 COVER RAIL 45 PLAIN ENDS 2 HOLES 11105 13 FOOT WELDED FOR 2 3 8 PIPE 14 SHELTERLOCK ANTI LOCK DEVICE 60X38MM 800372 15 1 RATCHET W 24 PLAIN STRAP SEWN ON WB601RS24...

Page 4: ...S BRACE PLAIN 38X1808X1 2T GRY 800389 5 TRUSS BRACE 38X828X1 2T 32 5 8 H H GRY 800391 6 TRUSS BRACE SWG 38X1866 7X1 2T 71 3 16 H H 800390 7 COVER RAIL 45 PLAIN ENDS 2 HOLES 11105 8 CROSS RAIL PLAIN END 2H 48 1 2 X1 3 8 11104 9 CROSS RAIL SWEDGED 50 1 2 X 1 3 8 DIA 11102 10 FOOT WELDED FOR 2 3 8 PIPE 800088 11 1 RATCHET W 24 PLAIN STRAP SEWN ON WB601RS24 12 SHELTERLOCK ANTI LOCK DEVICE 60X38MM 8003...

Page 5: ...heck that it measures 26 in width and the length would be determined by the size shelter you purchased Tie a rope diagonally from corner to corner B Measure across area end to opposite end See Detail A The measurement A and B should be equal 30 30 A B LENGTH OF BUILDING DETAIL A 2a Assemble End and middle Ribs 16 ft high DETAIL B End Ribs DETAIL C Middle Ribs 16 ft high MODEL ONLY See next page fo...

Page 6: ...ten all of the joints with the hardware indicated 800384 800384 800386 800386 800385 800438 800435 800385 800438 800435 800383 800384 800384 800386 800386 800385 800438 800436 800385 800438 800436 800383 800389 800390 800389 800390 800391 800391 20 ft high MODEL ONLY See previous page for 16ft high model 11131 2 3 4 Bolt All Connections 800859 800436 00690 11131 800859 800859 ...

Page 7: ...nd tighten Repeat these steps for the opposite side and all of the remaining ribs The side rails for the last rib will have two plain ends NOTE Sliding Cover Rail 11105 should be attached to frame after Step 9 once cover is installed See Step 10 4 Install Wind Braces Attach wind brace between the end rib and the first middle rib as shown in Detail E Bolts attached at the cross rails should be inse...

Page 8: ... the anchor D After the anchors are firmly set wrap the cable around the base rail and clamp 10016 Be sure to remove all slack from cable See Detail G 6 Install easy hook earth Anchors Base Rail DETAIL G 11133 5 Install Top Rail Place the first top rail under each end rib and secure it with a bolt as shown in Detail F The same cross rail should lay on top all of the middle ribs Secure the rails to...

Page 9: ...il and wind brace Replace the nut and tighten Repeat this on the other side See Detail H D At the bottom where the webbing exits the pocket on each side of end panel pull webbing to remove the slack Be careful not to pull the webbing through the other side of the webbing pocket E Insert the S Hook on ratchet into hole on the leg bend Insert the webbing into the spindle of the ratchet and pull tigh...

Page 10: ...ng buildings it may be necessary to use additional pipes in the middle See Detail K Remove pocket pipe to install later C Tie the rope on each of the exposed pipes and throw the other end of the rope over the frame See Detail L D Move to the other side of the frame and pull the cover over the frame with the rope This may require two or more people See Detail M Check that the Logo reads upright as ...

Page 11: ...pockets in cover top bolt 3 and 4 Way Clamps cover and cover rail together and in to place on the frame See Detail N NOTE Round head of carrage bolts should be touching cover C On end panels look for open slit and insert clamps inside shelter D Pull cover top tight and tighten bolts DETAIL N 11104 11105 11107 4 way clamp mid ribs 11130 11106 00690 11130 11107 00690 Middle Rib Cross Rail Clamps End...

Page 12: ...ver A 6 opening allows webbing to wrap around cover rail and base rail to secure cover Tighten webbing using ratchet as shown in Detail P DETAIL O DETAIL P Note check that your cover is correctly placed on the frame The ShelterLogic logo should line up on the left front and right rear corners near the top rail If the logo is not legible the cover has not been put on the frame correctly Check and t...

Reviews: