background image

INSTALLATIEHANDLEIDING – P25 

VERSION 0129NM02INT01 

INSTALLATION MANUAL – P25  | 

P25

EN

FR

07ANM20INT0

1

Step 11: Plug the RJ12 cable in the black P1 dongle, 
which is included in the box. Plug the P1 dongle in the 
Dynamic Power Management module.
Step 12: Connect it to the P1 port, as indicated in the 
’2.4.2 Overview Installing Accessories’ section; 

If both ends of the UTP cable are properly connected to
the charge point & Dynamic Power Management module 
and powered, the P1 LED will indicate whether the 
connection is correct. If the P1 LED does not show any 
signal, please check if the RJ12 connectors are properly 
connected using a network cable tester. If the led of the 
P1 port of the charge point is blue, the Dynamic Power 
Management is functioning. If it is red, the P1 dongle is 
forgotten. If there is no led on the P1 port, the cable is 
not correctly connected.

4.5 FINISHING UP

Step 1: Check and make sure that the rubber seal of the 
casing is properly in place on the edge;
Step 2: Place the cover on the charge point;
Step 3: Hand-tighten the four M4 x 12mm T20 bolts 
provided around the socket so that the cover closes on 
the rubber seal but the rubber seal does not deform;
Step 4: Hand-tighten the other two M4 x 12 mm T20 
bolts provided in the bottom of the cover;
Step 5: Turn the socket lid clockwise in the cover and 
hand-tighten the M4 x 20 mm bolt provided;
Step 6: Switch on power to the charge point;
Step 7: Wait until charge point is fully started up (+/-10 
minutes, the LED should be off)

4.6 CHARGE POINT CONFIGURATION

Charge point configuration should be done after the 
charge point is powered on, using the Home Charging 
by NewMotion app. To configure charge point features 
such as Dynamic Power Management, please follow the 
instructions as desribed in chapter 5 of this installation 
manual.

4. INSTALLATION PROCEDURE

Summary of Contents for newmotion Home Advanced Edition 7

Page 1: ...100 cm Home Advanced Edition 7 VERSION 07ANM20INT01 2020 MANUEL D INSTALLATION FR INSTRUCTION MANUAL EN...

Page 2: ......

Page 3: ...Table des mati res Table of contents Manuel d installation FR Pages 4 15 Instruction manual EN Pages 16 27 NewMotion Home Advanced Edition 7...

Page 4: ...s pinces d entr e CA doivent tre quip es d une terre ininterrompue des fins de protection Assurez vous que les c bles de connexion sont quip s de fusibles et de disjoncteurs Ne remplacez jamais un l m...

Page 5: ...nale DIN 912 taille 6 Pelle C ble d alimentation Clips de montage pour c ble DDR MCB Pour la configuration locale smartphone avec application d installation C ble UTP CAT5 ou CAT6 Outil de sertissage...

Page 6: ...Interface utilisateur Identification Backoffice de communication Module de gestion dynamique de la puissance de communication 07A _ _ _ _ _ Home Advanced 7 phase unique 32A Home Advanced 7 3 7 kW mono...

Page 7: ...Dimensions Poids Entr e requise Plage d humidit de fonctionnement Plage de temp rature de fonctionnement Certificats Cl ture des exigences de l armoire lectrique 55x25x30 mm 27 gr 5V DC 100mA 5 95 5...

Page 8: ...ION 0129NM02INT01 MANUEL D INSTALLATION P8 P8 EN FR 07ANM20INT01 2 3 APER U DU PRODUIT 2 APER U DES PRODUITS Type 2S EV Prise de courant et couvercle Lecteur RFID tiquette d identification avec num ro...

Page 9: ...ON P9 P9 EN FR 07ANM20INT01 2 APER U DES PRODUITS 2 4 1 APER U DES CONNEXIONS Port Ethernet Poteau de mise la terre Entr e de c ble de donn es UTP avec joint en caoutchouc Entr es pour les c bles lect...

Page 10: ...01 MANUEL D INSTALLATION P10 P10 EN FR 07ANM20INT01 2 APER U DES PRODUITS 2 4 2 APER U DE L INSTALLATION DES ACCESSOIRES P1 Port pour la gestion dynamique de l nergie Entr e de c ble de donn es UTP av...

Page 11: ...5mm Fil solide de 10 mm2 Fil de fer toronn de 6 mm2 avec embouts C ble PE le conducteur PEN n est pas autoris Electrode de mise la terre install e s par ment 100 ohms de r sistance la propagation 230...

Page 12: ...s appropri s l paisseur du des c ble s et placez le s dans l ouverture de l entr e du c ble d alimentation Lubrifiez si n cessaire pour faciliter le passage du c ble d alimentation tape 2 Fixez le s...

Page 13: ...rectement connect s l aide d un testeur de c ble r seau Si la LED du port P1 de la borne de recharge est bleue le module de gestion dynamique de l nergie fonctionne Si elle est rouge la cl de s curit...

Page 14: ...rging by NewMotion demande de scanner un code QR 5 1 VERROUILLAGE DE C BLE Activez la fonction de verrouillage du c ble pour verrouiller en permanence le c ble de charge 5 2 R GLAGE DE LA PUISSANCE S...

Page 15: ...disjoncteur m canique dans votre coffret lectrique attendez 15 secondes et rallumez le VOTRE BORNE DE RECHARGE EST IL MUNIE D UN VOYANT ROUGE CLIGNOTANT Si c est le cas cela signifie que vous utilise...

Page 16: ...he AC input clamps must be fitted with an uninterruptible earth for protection purposes Ensure that the connection cables are fitted with fuses and circuit breakers Never replace a protection componen...

Page 17: ...old separately DIN 912 HEX allen key Size 6 Shovel Power cable Cable mount clips RCD MCB For local configuration smartphone with Installer app UTP cable CAT5 or CAT6 RJ45 UTP cable crimp tool RJ45 con...

Page 18: ...r interface Identification Communication backoffice Communication Dynamic Power Management module 07A _ _ _ _ _ Home Advanced 7 single phase 32A Home Advanced 7 3 7 kW single phase 16A Class I Type 2S...

Page 19: ...IONS CONTINUED 2 PRODUCT OVERVIEW P1 DONGLE SPECIFICATIONS Stand by consumption Operating temperature range Operating humidity range Operating air pressure range Maximum mounting height socket Advised...

Page 20: ...P20 VERSION 0129NM02INT01 INSTALLATION MANUAL P20 P20 EN FR 07ANM20INT01 2 3 OVERVIEW OF PRODUCT 2 PRODUCT OVERVIEW Type 2S EV Plug socket cover lid RFID Reader Identification label with serial numbe...

Page 21: ...EHANDLEIDING P21 VERSION 0129NM02INT01 INSTALLATION MANUAL P21 P21 EN FR 07ANM20INT01 2 PRODUCT OVERVIEW 2 4 1 OVERVIEW OF CONNECTIONS Earthing pole Inlets for power cables Power cables clamps Phase 1...

Page 22: ...2 VERSION 0129NM02INT01 INSTALLATION MANUAL P22 P22 EN FR 07ANM20INT01 2 PRODUCT OVERVIEW 2 4 2 OVERVIEW INSTALLING ACCESSORIES P1 Port for Dynamic Power Management UTP data cable inlet with rubber se...

Page 23: ...nded wire with ferrules PE cable PEN conductor is not allowed Separately installed grounding electrode 100 Ohm spreading resistance 230V N 10 50Hz Cable grommets sizes Maximum cable terminal block TN...

Page 24: ...Warning Keep charge point switched off during installation 4 4 DYNAMIC POWER MANAGEMENT MODULE The Dynamic Power Management Module package contains one Dynamic Power Management module one power adapt...

Page 25: ...e P1 port the cable is not correctly connected 4 5 FINISHING UP Step 1 Check and make sure that the rubber seal of the casing is properly in place on the edge Step 2 Place the cover on the charge poin...

Page 26: ...n which is included in the charge point package when the Installer App requests to scan a QR Code 5 1 CABLE LOCK Enable the cable lock feature to permanently lock the charge cable 5 2 POWER SETTING Se...

Page 27: ...n your fuse box wait 15 seconds and turn it back on IS THERE A BLINKING RED LED LIGHT ON YOUR CHARGE POINT If so it means you are using a card which is not linked to the charge point by your installer...

Page 28: ......

Reviews: