INSTALLATIEHANDLEIDING – P10
VERSION 0129NM02INT01
INSTRUCTION MANUAL – P10 |
P10
085NM19INT01
EN
DE
If connecting to a 230V 3-phase grid without neutral; only install 1-phase and connect one of the two other phase
wires in the neutral wire connection on the terminal block.
3. PRODUCT OVERVIEW
3.4 OVERVIEW OF CONNECTIONS
INSIDE
INSIDE
Business Pro:
RJ45 UTP data port for
Ethernet / Mobile router
connection
Business Lite:
RJ45 UTP data port for
connection switch (star
configuration) or daisy
chain incoming
Earthing pole
for pole mount
UTP data cable
inlet with rubber
seal
UTP data cable inlet
with rubber seal
Inlet for power
cable with tension
relief clamps
Terminal block
SMED with LCD
user display &
Proximity
sensor-set
Tension relief for
data cable(s)
L1
N
PE (earthing)
Business Pro:
RJ45 UTP data port for
connection Switch in star
configuration or Business
Lites in Daisy chain
configuration
Business Lite:
RJ45 UTP data port for
daisy chain outgoing
DC-fault current
detection module
Business Pro:
RJ45 UTP data port for
Ethernet / Mobile router
connection
Business Lite:
RJ45 UTP data port for
connection switch (star
configuration) or daisy
chain incoming
Business Pro:
RJ45 UTP data port for
connection Switch in star
configuration or Business
Lites in Daisy chain
configuration
Business Lite:
RJ45 UTP data port for
daisy chain outgoing
Phase 2
Phase 3