INSTALLATIEHANDLEIDING – P16
VERSION 0129NM02INT01
INSTRUCTION MANUAL – P16 |
P16
085NM19INT01
EN
DE
5. INSTALLATION PROCEDURE
5.7 CHECK FUNCTIONING
Step 1; Power on the chargepoint and let it start up (give
it a few minutes);
Step 2; Check start screen and connection, the display
should show the initial start screen as shown below;
Step 3; The date and time need to show up as grey
text. If it shows red text the SMED is not synchronised
(backoffice connection issue) or not yet fully started up;
Step 4; You can refer to the user manual for more use
related instructions*;
*Alternatively the owner/operator manual can also be
consulted;