background image

Step 2: Rear Wall

PART

NO.

Qty.

1

P1

S3

6

2

P2

4

P3

P2

P1

P2

P3

P3

P3

P3

-11-

P1

P3

P3

P3

P3

P2

P2

P3

P2

F1

S3

31

1

31

F1

6

31

31

Summary of Contents for SU-A68-AP

Page 1: ...Metal Garden Shed OWNER S MANUAL Instructions for Assembly Requires two people and takes 1 1 5 hours for lnstallation Quick Easy Assembly Ridge Reinforced Walls Available in Various Sizes SU A68 AP...

Page 2: ...t you have all the necessary parts for the building Separate contents of the carton by the part number while reviewing parts list Familiarize yourself with the hardware and fasteners for easier use du...

Page 3: ...level concrete footings and the frame drilled and screwed to the base IMPORTANT NOTES l Find someone to help you it is much easier with someone to hold parts pass tools ect Also some steps require two...

Page 4: ...1660mm 1660mm 1322mm 1322mm 1750mm 1718mm 1784mm 1210mm 1210mm 1750mm P1 5 1750mm GS 4 L1 8 B6 4 F3 F1 F2 S3 S2 290 24 26 60 84 K1 8 P3 4 1750mm P7 4 1150mm P9 4 1150mm 18 1 19 1 GE 2 1788mm 1788mm 21...

Page 5: ...PART NO Qty D1 1 D2 1 1716mm 1716mm PART NO Qty SX 1 YS 1 SX1 1 75mm PART NO Qty BW 1 BN 1 BD 2 HZ1 1 HZ2 1 FG 1 FG1 2 FG2 2 FG3 2...

Page 6: ...21R 21L 21R 18 20 20 P1 P1 P1 P1 P1 P2 P2 P2 P2 P2 P3 P3 P3 P3 P2 4 4 3 3 2 2 1 1 6 5 8 8 16 16 16 16 L1 L1 L1 L1 L1 L1 L1 L1 P9 P9 P9 P9 B6 B6 B6 B6 D2 D1 D M8 M8 QD8 M1 QD8 M1 G3 M8 M8 QD8 M1 QD8 M1...

Page 7: ...2 1 3 4 5 6 ASSEMBLY OVERVIEW...

Page 8: ...8 7 ASSEMBLY OVERVIEW...

Page 9: ...PART NO Qty 4 P1 Step 1 Side Walls 2X S3 4 F1 4 9 2 P2 P1 P1 P1 P1 P2 P2 P1 P1 32 F1 S3 32 32 2 32...

Page 10: ...Step 1 Side Walls 2X 3 PART NO Qty 2 2 4 F1 8 S3 8 4 3 P1 4 3 P1 P2 4 P2 3 F1 S3 P1 P1 P2 10...

Page 11: ...Step 2 Rear Wall PART NO Qty 1 P1 S3 6 2 P2 4 P3 P2 P1 P2 P3 P3 P3 P3 11 P1 P3 P3 P3 P3 P2 P2 P3 P2 F1 S3 31 1 31 F1 6 31 31...

Page 12: ...Step 2 Rear Wall 1 PART NO Qty 1 1 2 F1 12 S3 12 2 1 P2 2 1 P2 P1 2 P1 1 F1 S3 P1 P3 P2 P3 P3 P3 P2 12...

Page 13: ...P2 8 8 8 5 5 13 Step 3 Front Wall PART NO Qty 2 P2 F1 6 S3 6 1 5 1 6 2 8 P2 P2 8 6 F1 S3 6 8 P2 8 F1 S3 F1 S3 2 33 5 6 8 8 33 33 33 33...

Page 14: ...Step 3 Front Wall 1 PART NO Qty 1 1 2 F1 4 S3 4 2 1 P2 2 P2 P2 1 P2 P2 P2 1 2 F1 S3 8 8 5 14...

Page 15: ...Step 4 Wall Assembly L1 PART NO Qty 8 Above below L1 F1 L1 F1 1 3 3 1 15 L3 4 F1 32 intermediate L3...

Page 16: ...Step 4 Wall Assembly PART NO Qty F1 24 16 4 S3 24 Above below F1 S3 16 16 16 16 16 F1 S3...

Page 17: ...17 Step 4 Wall Assembly PART NO Qty L2 4 L2...

Page 18: ...18 Step 5 Gable Beam Assy 21L PART NO Qty 2 F1 60 20 2 F2 8 F2 F2 20 21 F1 F1 S3 4 6 21L 21R 21L 21R F2 8 8 21R 2 M1 2 QD8 M8 2 2 QD8 M1 M8 F1 F1 2 4...

Page 19: ...Step 5 Gable Beam Assy PART NO Qty F1 28 13 2 14 2 18 1 18 14 13 13 14 F1 S4 13 14 S4 4 F1 19 F1 S4...

Page 20: ...f installation PART NO Qty F1 66 P7 4 P9 4 12 2 GS 4 GE 2 19 1 14 P9 P7 P7 13 P7 P7 F1 S4 P7 P7 P9 P7 P7 P9 12 12 GS GS F2 F2 8 12 19 GE GE F1 S4 19 GE P9 P9 P9 14 13 14 13 20 F1 S4 F1 S4 S4 GC 4 GC...

Page 21: ...PART NO Qty D2 1 B6 2 Step 7 Door Assembly F3 B6 QD8 M1 M8 F1 F3 6 M1 1 QD8 M8 1 1 F1 5 F3 B6 21...

Page 22: ...22 PART NO Qty D1 1 Step 7 Door Assembly...

Page 23: ...D 1 PART NO Qty B6 2 Step 7 Door Assembly 23 F3 6 M1 1 QD8 M8 1 1 F1 17 F3 B6 QD8 M1 M8 F1 F3 B6 D F1...

Page 24: ...F3 F3 F3 F3 Step 8 Installing the door and lock PART NO Qty F3 6 4 B6 24...

Page 25: ...PART NO Qty BW 1 BN 1 BD 1 HZ1 1 HZ2 1 FG 1 FG1 2 FG2 2 FG3 2 PART NO Qty SX 1 YS 1 SX1 1 75mm K1 8 Step 8 Installing the door and lock 25 K1...

Page 26: ...26 SX SX1 HZ1 HZ2 FG2 FG2 BW FG3 FG3 BW BD BD BN FG1 FG1 FG YS Step 8 Installing the door and lock...

Page 27: ...Step 8 Installing the door and lock PART NO Qty G3 2 G3 G3 27...

Page 28: ...ng methods to adjust Lock failed Loosen the F1 F2 screw Loosen the F1 screw internal external Move 8 to the left or right and lock F1 Move 8 to the left or right and lock F1 F2 internal 7 8 8 7 8 8 8...

Reviews: