25
VC-S2000HM
Figure 4-43.
INSTALLING THE SHIFTER
Figure 4-42.
1. Make sure that the loading gear is at the PHASE-
MATCHING point
1
as shown below.
2. Install, paying attention to insert point
5
and release
point
3
.
3. For the phase matching at the insert point
1
, see the
PHASE-MATCHING point
2
as shown below.
4. Finally fix the inserts
1
and
4
.
Capstan
D.D. motor
Drum
Reel pulley
(Bottom side of mechanism chassis)
Sifter
Phase-Matching
point
2
Insert
point
1
Half round notch
Shaft
1
Round mark
Loading gear (T)
Insert
point
3
Insert
point
4
Insert
point
5
Release
point
3
Phase-matching
point
1
Shaft
1
Shaft
1
Shaft
2
Insert
point
2
Rotation
point
2
Summary of Contents for VC-S2000HM
Page 53: ...53 VC S2000HM 8 BLOCK DIAGRAM POWER CIRCUIT BLOCK DIAGRAM ...
Page 54: ...55 54 VC S2000HM VC S2000HM SYSTEM SERVO BLOCK DIAGRAM ...
Page 55: ...57 56 VC S2000HM VC S2000HM SIGNAL FLOW BLOCK DIAGRAM 1 2 ...
Page 56: ...59 58 VC S2000HM VC S2000HM SIGNAL FLOW BLOCK DIAGRAM 2 2 ...
Page 57: ...61 60 VC S2000HM VC S2000HM AUDIO BLOCK DIAGRAM ...
Page 66: ...76 1 2 3 4 5 6 7 8 9 10 A B C D E F G H I J VC S2000HM OPERATION R CIRCUIT ...
Page 79: ...76 1 2 3 4 5 6 7 8 9 10 A B C D E F G H I J VC S2000HM OPERATION R CIRCUIT ...
Page 80: ...57 56 VC S2000HM VC S2000HM SIGNAL FLOW BLOCK DIAGRAM 1 2 ...
Page 81: ...59 58 VC S2000HM VC S2000HM SIGNAL FLOW BLOCK DIAGRAM 2 2 ...
Page 82: ...55 54 VC S2000HM VC S2000HM SYSTEM SERVO BLOCK DIAGRAM ...
Page 83: ...53 VC S2000HM 8 BLOCK DIAGRAM POWER CIRCUIT BLOCK DIAGRAM ...
Page 84: ...61 60 VC S2000HM VC S2000HM AUDIO BLOCK DIAGRAM ...