TAbLE OF CONTENTS
FOR INSTALLATION PERSONNEL .............................
TAbLE OF CONTENTS ................................................
1 FOR SAFE INSTALLATION WORk ....................4-9
1.1 Cautions regarding installation of
solar power systems ..............................................6
1.2 SRS Mounting System .......................................7-8
1.3 PV modules ...........................................................8-9
POINTS TO CHECk WHEN SELECTINg THE
INSTALLATION LOCATION ................... 9-1
2.1 Condition of house where solar power
system is to be installed ................................ 9-10
2.2 Checking the solar power system
installation location ......................................11-12
SPECIFICATIONS ......................................... 1-14
3.1 Solar module and array specifications
modules: ND-167U1Y / ND-187U1 /
ND-187U1F ............................................................13
3.2 ND-167U1Y / ND-187U1 / ND-187U1F
module array layout dimensions ...................14
4 PARTS .......................................................... 15-19
5 POINTS TO CHECk bEFORE INSTALLATION
WORk .......................................................... 19-0
6 INSTALLATION WORk ................................. 1-44
6.1 Preparing shingle roof
for installation .......................................................21
6.2 Checking layout ...................................................22
6.3 Installing the optional flashings ....................23
6.4 Installing standard slider assembly ...............24
6.5 Preparing tile roof installation ........................25
6.6 Checking layout ...................................................26
6.7 Installing tile slider assembly ....................27-30
6.8 System grounding ..............................................31
6.9 Installing module support rails ......................32
6.10 Installing front cover ..........................................33
6.11 Installing the modules on
the SRS mounting system ..........................34-35
6.12 Installing top cover .......................................35-36
6.13 Installing side cover ............................................36
6.14 Connecting the solar modules .................36-38
6.15 Testing module strings for correct
voltage ....................................................................39
LIMITEd WARRANTy .................................back cover
Summary of Contents for SRS Mounting System
Page 41: ...NOTES ...