2008-03-14
LC-32SV21L&LC-42SV31L
23
[2] SET RE-ASSEMBLY
To re-assemble the whole set, execute all processes in reverse order.
Note
a. While re-assembling, make sure that all cables are placed and connected in their original position.
b. Pay special attention not to damage the EMC foams at the SSB shielding. Check that EMC foams are put
correctly on their places.
Summary of Contents for LC-32SV21L
Page 6: ...LC 32SV21L LC 42SV31L 6 TV Front TV Side Rear ...
Page 11: ...2008 03 14 LC 32SV21L LC 42SV31L 11 3 DIMENSIONS ...
Page 21: ...2008 03 14 LC 32SV21L LC 42SV31L 21 B Remove 15 screws as Fig 9 Fig 9 ...
Page 54: ...LC 32SV21L LC 42SV31L 54 Pin Connections and Short Description ...
Page 55: ...2008 03 14 LC 32SV21L LC 42SV31L 55 ...
Page 62: ...LC 32SV21L LC 42SV31L 62 CHAPTER 6 BLOCK DIAGRAM WIRING DIAGRAM 1 BLOCK DIAGRAM ...
Page 63: ...2008 03 14 LC 32SV21L LC 42SV31L 63 ...
Page 96: ...LC 32SV21L LC 42SV31L 96 2 CABINET PARTS LC 32SV21L ...