42
Assigning of PLUs to commission groups
You can assign PLUs (or subdepartments) to commission groups.
For each PLU
For a range of PLUs
*1,2,3 : 1 through 999999
*A
: Commission group 0-9 (0=no commission)
For each PLU
For a range
of PLUs
Commission
group number
PLU range
2235
. ≈
12
≈
14
≈
1
:
;
Key operation
Commission
group number
2215
. ≈
1
≈
1
:
;
Key operation
Example
2235
.
≈
≈
:
;
* 3
To apply the current setting of start
PLU code to PLUs within the range
The current
setting
is displayed.
≈
* 2
Start PLU code
End PLU code
* A
2215
.
≈
≈
:
;
* 1
To keep the current setting
To program for the follwing PLU
The current
setting
is displayed.
PLU code
c
* A
Procedure
2235
2215
PGM 2