38
13VT-N200
INSTALLING THE MASTER CAM (AT REAR
SIDE OF MECHANISM CHASSIS)
1. Make sure beforehand that the shifter is at the point as
shown below.
2. Place the master cam in the position as shown below.
Note:
See the figure below for the phase matching between the
master cam and the casecon drive gear.
3. Finally fix with the E-ring.
Figure 1-44-2.
When installing the master cam,
align the casecon drive gear
round mark with the half-round
notch of master cam.
E-ring
(XRESJ30-06000)
Master cam
Fully turn
clockwise
Fully turn counterclockwise
Figure 1-44-1.
Face the wide tooth side ward
Master cam
Casecon drive gear
10.2 mm
Round mark
Half-round notch
+0
.2
–0.2
Apply grease
No grease
REPLACEMENT OF LOADING MOTOR
• Removal
• Replacement
1. Remove the loading motor, and install the replace-
ment loading motor as shown below.
Figure 1-46.
The loading motor pressing-in must be less than
14.7 N (15 gf).
Adjust the distance between motor and pulley to
10.2 mm).
Figure 1-45.
Apply grease
+0
.2
–0.2
Summary of Contents for 13VT-N200
Page 55: ...57 13VT N200 56 12 11 10 9 8 7 6 5 4 3 2 1 A B C D E F G H BLOCK DIAGRAM OF TV SECTION ...
Page 57: ...61 13VT N200 60 12 11 10 9 8 7 6 5 4 3 2 1 A B C D E F G H Ë SERVO PROCESS BLOCK DIAGRAM ...
Page 60: ...65 13VT N200 64 12 11 10 9 8 7 6 5 4 3 2 1 A B C D E F G H Ë VIDEO SIGNAL FLOW BLOCK DIAGRAM ...
Page 61: ...67 13VT N200 66 12 11 10 9 8 7 6 5 4 3 2 1 A B C D E F G H Ë AUDIO BLOCK DIAGRAM ...
Page 62: ...69 13VT N200 68 12 11 10 9 8 7 6 5 4 3 2 1 A B C D E F G H OVERALL SCHEMATIC DIAGRAM ...
Page 71: ...83 13VT N200 6 5 4 3 2 1 A B C D E F G H PWB C POWER Unit Wiring Side ...
Page 72: ...84 13VT N200 6 5 4 3 2 1 A B C D E F G H PWB A MAIN Unit Wiring Side ...
Page 73: ...85 13VT N200 6 5 4 3 2 1 A B C D E F G H PWB A MAIN Unit Chip Parts Side ...