
9.801-
296.0•Shark•Rev.11/12
OPERA
T
OR’S MANU
AL
PRESSURE
W
ASHER
6
W
ARNING:
TA
NK FILL
ELBO
W
DO NO
T PLUG
VENT HOLE
P
ar
t No
98012690-6
GROUND
L2
L3
L1
L2
L3
L1
98012960-5
C
W
ATER
INLET
COLD
W
ATER
OUTLET
40°
40°
25°
WARNING
15°
ON
PRENDER
OFF
I
O
98012960-4
98012960-3
ASSEMBLY INSTRUCTIONS
STEP 1:
Place machine in a con-
venient location providing ample
support, drainage and room for
maintenance. Remove pallet bolts
and remove pallet, then re-install
bolts to level machine by adjusting
(machine must be level).
STEP 3:
Remove the hex head
screws from electrical access panel.
Note:
bottom right screw will only
loosen; access panel is designed
to pivot on this screw. Once access
panel is rotated out of the way, at-
tach the electrical harness from
the pressure washer to the heating
module as follows:
a. Feed pressure washer wire
harness through the upper
wire hole located on the side
of the machine.
b. On the right side of the in-
coming power terminal block,
connect the black wire to line
L1, the red wire to line L2, and
the white wire to line L3.
c. Attach the green wire to the
ground terminal block.
CAUTION
:
Have qualified electri-
cian attach the proper supply
cord to the terminal labeled L1,
L2 and L3.
STEP 2:
Place the cabinet on top
of the heat exchanger and attach
the small high pressure hose to the
fittings as shown.
Garden
Hose
Incoming
Power
Terminal
Block
Ground
Terminal
Block
STEP 4:
Do not turn power on to equipment until the heating module is
filled with water, as severe damage may occur to heater elements.
Prior to shipping, a rust inhibitor powder was added to the hot water
tank. This powder will mix with the added water to prevent rust build-
up inside the tank.
Install water fill spout (shipped loose). Spout opening should be fac-
ing up. Insert water hose and fill. Do not over fill to allow for thermal
expansion. (Maximum is 80 gallons). After heater tank has been filled
to the top, operate for one week and then add one quart of oil to slow
evaporation. Be sure to replace spout plug, hand tight only.
Turn on main power supply to unit. Set 7 day programmable timer
to desired ON/OFF time and switch machine power on, Water will
heat up to operating temperature in 30 to 60 minutes. The heater will
turn off automatically when 200°F is reached. Water will come out of
heater fill spout due to heat expansion. However, this will stop after
temperature is reached.
Leave main power on to the machine to ensure hot water on pump
start up.
Small High
Pressure Hose
Water Fill
Spout