AFF/D 135
12-2-2015
-13-
Matt Asselman
10
OPERATION
PREPARATION
1.
Check that the air pressure is connected.
2.
Clear the working surface.
3.
Check that the heating element is connected to the control unit.
4.
Check that all the upper heating element and pressure bars are firmly attached to the top
frame.
5.
Make sure to tape off the vacuum cups that will not be used, using the masking tape provided
with the machine. This ensures the material stays sucked to the working surface.
SWICHTING ON HEATING ELEMENT
1.
Switch on control unit with switch(
H
) (see 8.4).
SETTING TEMPERATURE
The temperature of the element can be set using the
temperature control.
1.
Press button A to enter the temperature setting
2.
To increase the temperature, push button B
3.
To decrease the temperature, push button C
4.
Press button A to exit the temperature setting, or
wait 30 seconds.
5.
Check if the heating element warms up (do not touch
the element, due to risk of burning yourself)
SETTING CYCLE TIME
The time during which the machine is closed to heat the plastic sheet can be set on the timer
unit. At first use of the machine, set E = 3 and F = 5 (see 10.3)
1.
Switch between values withe the
▼
/
▲
buttons.
2.
Increase of decrease the value with the +/- buttons
3.
Cancel the value with the
“ESC”
button
4.
Confirm the value with the
“OK”
button
FOOT SWITCH
The top frame is served by pressure on the pedal of the foot switch.
SETTING AIR PRESSURE
The pressure for the system is adjusted by the factory on the right value (6 bar).
C
B
A