If you have purchased a one-canopy system, skip steps 9 & 10.
Measure inward from the centerline of the outside track 5’-4”.
Place the
Mid-beam Bracket
on the cross beam at this distance.
This location should be directly across from the End Mounting
Bracket on the house (step 1.) Using the
Mid-beam Bracket
as
a template, mark the four mounting hole locations. Remove
the bracket and drill through one side of the
Header Beam
and
its aluminum insert with the 9/64” drill bit. Secure the
Mid-
beam Bracket
in place with four 7/8” Tapping Screws (A).
Step 10
Assemble
Mid-beam Bracket
Header beam
Mid-beam Bracket
5’-4” to centerline
of outside track.
5’-4” to centerline
of outside track.
Mounting holes
Insert the arm of the
Extender
and the arm of the
Mid-beam
Bracket
into the
Middle Projection Beam
. Secure the beam by
inserting two 7/8” Tapping Screws (A) into the beam at each end.
Step 11
Connect
Middle Projection Beam
Mid-beam
Bracket
Middle
Projection Beam
Step 12 Fasten
the system together
If the posts are cemented, remove the screw holding the vinyl
posts up and slide the vinyl posts backdown the wood posts.
Use a square and a level to make sure the posts are all square
and the beams are level. Proceed to insert screws into all
remaining fastening points. The quantity, type, and location of
all screws is shown below.
Be sure to use the plastic washer on each screw so a plastic cap
can be applied to cover the screw.
For a guide to screw hardware see page 3.
(4) C
(6) A
(6) A
(8) B
(6) A
(6) A
(8) B
(6) A
(6) A
(8) B
(6) A
(6) A
Extender
End Mounting
Bracket
Header
Beam
(8) B
(4) C
Assemble the
Header Beam
to the Projection Beam/post
assembly. Have your helper hold one vertical
Post
in position
while you steady the 2nd vertical
Post
. Insert the arm on the
Corner Brackets
into the
Header Beam
on both ends.
Place a bubble level on top of the
Header Beam
to confirm
that it is level. If it is not, loosen the set screws on the
Corner
Brackets
and lower or raise the
Corner Brackets
on the
Post
as
necessary. Once level, drill eight 9/64” holes through the
existing mounting holes on the
Corner Bracket
and into the
Post
. Fasten each corner with eight 1-1/4” Tapping Screws (B).
To secure the
Header Beam
, screw two 7/8” Tapping Screws
(A) through the pre-drilled holes on the top of the
Header
Beam
into the
Corner Brackets
at both corners.
Step 9
Connect
Posts
Header
Beam
Projection
Beam
Post
Fixed-post positions
corner bracket
ShadeTree
®
Canopy Systems
Assembly Instructions
The Greenbriar
ShadeTree Cool Living, LLC
— For questions or assistance call
800-894-3801
.
7