
Installation space requirements
Page 14
Overview of airways
The following areas for incoming air and
exhaust heat removal must remain
accessible:
(1) Incoming air
(2) Air cooling via heat exchanger
(3) Exhaust heat removal
(4) Wastewater/exhaust gases
Exhaust heat and exhaust gases can be extracted from the installation space
either at the side or through the base. The exhaust gas (condensate is also
produced here) can also be discharged into the bilge on yachts.
Exhaust heat and exhaust gas hose via the
side wall
Exhaust heat and exhaust gas hose via the
base
(1) Incoming air inlet
(2) Exhaust heat outlet
(3) Exhaust gas hose outlet
Summary of Contents for EFOY Pro
Page 1: ...Safety instructions...