CONTENTS
Copyright / Disclaimer - SANIPUMP Installation and Maintenance Manual
®
- Original operating instructions
All rights reserved. The contents of this document must not be reproduced, modified or disclosed to third parties except upon written consent
from the manufacturer. This document may be subject to change without notice.
SFA - 41 Bis Avenue Bosquet - 75007 PARIS
1. SAFETY
........................................................
pg.18
1.1 Identifying the warning signs ..............................pg.19
1.2 General information ..........................................pg.19
1.3 Intended use ......................................................pg.19
1.4 Qualification and training of staff .........................pg.20
1.5 Safety instructions for maintenance, .....................pg.20
inspection and installation
1.6 Consequences and risks of non-compliance ...........pg.20
with the operating manual
2. TRANSPORT / TEMPORARY STORAGE
RETURN / DISPOSAL
.....................................
pg.20
2.1 Receiving inspection ...........................................pg.20
2.2 Transport ..........................................................pg.20
2.3 Disposal ...........................................................pg.21
3. DESCRIPTION
.............................................
pg.21
3.1 General description and method of operation ........pg.21
3.2 Scope of supply .................................................pg.21
3.3 Rating plate .......................................................pg.21
3.4 Technical specifications ......................................pg.22
3.5 Pumped fluids ...................................................pg.23
3.6 Installation of the SANIPUMP
®
pumping station .....pg.23
3.7 Electrical connection ..........................................pg.24
4. COMMISSIONING
.....................................
pg.24
4.1 Prerequisites for commissioning ............................pg.24
4.2 Application limits ...............................................pg.24
4.3 Starting and stopping ........................................pg.25
4.4 Starting frequency .............................................pg.25
4.5 Operations required for commissioning ................pg.25
4.6 Decommissioning ...............................................pg.25
5. MAINTENANCE
..........................................
pg.26
6. INSPECTION AND MAINTENANCE
CHECKLIST
........................................................
pg.27