12
ENGLISH
(A) Mounting holes for Floodlight
(B) Screw with handle
(C) Security bolt with safety clip pin
(D) U-profile for crane adaption
Vertical alignment
For vertical alignment untighten screws/nuts on
both sides and turn floodlight into desired position.
Vertical alignment is possible in different angles. After
adjustment tighten both screws/nuts.
Alignment
Installation crane rack:
A
B
C
D
Fix floodlight to the corresponding mounting holes
(A) using secured screws. Bring floodlight up into the
desired position. Place rack (D) on crane. Fix security
bolts (C) on both sides of the rack and fix secure with
splint. Tighten Screws with handle (B) to fix rack into
final position. Floodlight is ready for operation.
A) Connect the plug of the powerline with a corres-
ponding socket. After applying the plug to the socket
the floodlight is ready for operation.
B) Fix power line with coupling to the fixed plug on
the backside of the floodlight. Fix line to power sup-
ply. Floodlight is now ready for operation.
INFORMATION!
Plugs of protection class IP67 are equipped with
a bayonet system. To reach full protection, fully
tighten bayonet ring.
Electrical connection
SETO CRANESTAR
ALDEBARAN
®
CRANEMASTER 2.0
Summary of Contents for AC1000 LED H24
Page 8: ...8 DEUTSCH Notizen...
Page 15: ...15 ENGLISH Notes...