Installation, Start Up and Shut Down DF-745SG
13
4 Installation, Start Up and Shut
Down
Installation of the analyzer requires the following steps be followed:
Connecting the pneumatic pressure service to the pneumatic inlet fitting
Connecting the sample gas line to the analyzer inlet fitting
Making the power connection to the analyzer
POWER SWITCH
USB PORT
H O SENSOR
2
Figure 2: Major Internal Components
4.1 Analyzer Installation
4.1.1 Pneumatic Pressure Line Connection - Optional
The pneumatic gas connection (required for the optional gas panel) is a 1/8 inch
compression fitting as shown in Figure 4 and requires 70 – 125 psig air or N2
pressure.
Summary of Contents for NanoTrace DF-745SG
Page 1: ...NanoTrace Moisture Analyzer DF 745SG OPERATOR MANUAL ...
Page 4: ......
Page 12: ......
Page 18: ......
Page 28: ......
Page 30: ...24 DF 745SG Options ...
Page 72: ......
Page 74: ......
Page 80: ......
Page 82: ......
Page 86: ...80 DF 745SG Appendix A User Menu Screens Page 47 Page 49 Page 52 Page 53 Page 55 Page 56 ...
Page 88: ...82 DF 745SG Appendix A User Menu Screens ...
Page 93: ......