17
STEP 1: The connector and cable are required to be reliably connected as shown below.Order of connection
is L
(
Red
),
N
(
Black
),
, -PE
Cable sectional are 6 mm
²
,
stripping length 6mm
`
Figure 2-19
STEP 2: Measure grid voltage by multimeter, ensure grid voltage is less than the high limit of voltage required
by all national grid standards.
STEP 3: Connect connector to AC Load interface and grid interface, rotate and lock them.
Figure 2-20
Note: Do not connect reverse the backup load side connector and the grid side connector.
STEP 4: PE Installation
Summary of Contents for SMT-5K-TL-LV
Page 6: ......