Sermatec SMT-5K-TL-LV User Manual Download Page 1

5kW All-in-one the Hybrid Inverter User Manual

Important Notice

In order to protect the legitimate rights and interests of users, please read our operating procedures and

safety instructions carefully before using this equipment. Please operate the equipment according to the

operating procedures and safety instructions.

Once using this device, you are deemed to have read, understood, endorsed and accepted all terms and

contents of the device's operating procedures and safety instructions. The User is committed to being

responsible for his or her actions and all consequences arising therefrom.

The User undertakes to use the device solely for legitimate purposes and agrees to these Terms and any

relevant national policies or guidelines.

In using this equipment, please strictly observe and implement the requirements including but not limited to

the operating procedures and safety instructions. All personal injury, accident, property damage, legal

disputes and other adverse events that cause conflicts of interest caused by violations of the user instructions

or force majeure indicated by the safety instructions are the responsibility and loss of the User. Our company

will not assume any responsibility.

Copyright, all rights reserved. The content is subject to change without notice.

Caution!
Failure to observe a warning indicated in this manual may result in injury.

The danger of high voltage and electric shock!

Refer to the operating instructions

Signals danger due to electrical shock and indicates the time(5 minutes)to
allow after the inverter has been turned off and disconnected to ensure safety
in any installation operation.

The danger of hot surface!

Protective earth

Summary of Contents for SMT-5K-TL-LV

Page 1: ...In using this equipment please strictly observe and implement the requirements including but not limited to the operating procedures and safety instructions All personal injury accident property damag...

Page 2: ...should be tightened Otherwise there is a risk of falling and dumping Install the selected cables terminals and other components to meet the current requirements Before and after installation ensure t...

Page 3: ...rwise there is a fire risk Operation risk notification Do not use the system in the event of equipment failure Do not operate without authorization when the equipment is abnormal Please strictly follo...

Page 4: ...3 The Document version A04 2019 08 17 4 2 Software upgrade The PCU software name is changed to PCU5KSL bin The DSP software name is changed to DSP5KSL bin The Document version A05 2019 12 04 4 2 Softw...

Page 5: ...tion preparation 8 2 3 Installation 10 2 4 Installation check 21 3 Sermatec APP 23 3 1 Software acquisition 23 3 2 Connect to internal Wi Fi 23 4 System Commissioning 24 4 1 Check before commissioning...

Page 6: ......

Page 7: ...nverter circuit auxiliary power source filter circuit system control unit and a system monitoring unit including a system communication unit etc This product generally applies to solar storage system...

Page 8: ...e Peak Bottom mode and AC coupling mode The Inverter must be configured in APP before powering on working parameters Grid standard DC side battery type battery protocol meter protocol working mode wor...

Page 9: ...o the load together with insufficient PV Figure1 6 3 Anti back flow is default disabled Typical application scenarios Figure1 5 Figure1 6 Mode 2 Energy Storage mode Suitable for Areas with Unstable Gr...

Page 10: ...ricity Price According to the electricity price of utility the whole day can be divided into four periods most of the place tip peak flat and bottom price 1 During the price of the bottom period the g...

Page 11: ...12 Grid price In Bottom Time Period Figure1 13 In Flat Time Period Figure1 14 PV is insufficient Figure1 15 PV is sufficient In Tip and Peak Time Period Figure1 16 PV is insufficient Figure1 17 PV is...

Page 12: ...he rest power of PV will feed into the grid 4 When PV insufficient Battery and PV supply power to the load simultaneously Battery and grid supply power to the load simultaneously when battery with low...

Page 13: ...rter can only be installed by personnel who have received training in the Hybrid Inverter and have a good knowledge of the Hybrid Inverter During the installation process always observe the safety pre...

Page 14: ...arrive at the installation site can the unpacking box be allowed to be inspected The inspection is completed by the customer s representative and the supplier s representative Unpack the package revi...

Page 15: ...0001 manufacturer Amphenol 7 Multimeter 2 2 4 Installation requirements 1 Wall bracket Installation 1 It is necessary to ensure that the installation position is flat and the thickness of the whole wa...

Page 16: ...the hybrid inverter 4 The mounting position is supposed to avoid direct sunlight Figure 2 3 Perpendicularity requirement 2 Installation space requirements Product installation position leave 300 mm of...

Page 17: ...P 2 Hammer expansion tube into the wall mount bracket on the wall keep aligned with the holes Figure 2 6 STEP 3 Mount the Sematec hybrid inverter on the bracket Figure 2 7 STEP 4 Secure the inverters...

Page 18: ...STEP 5 Install anti theft lock if necessary Optional equipped by user Figure 2 9 2 3 2 Electrical Connection Hybrid Inverter System Connection Diagram Figure 2 10 Hybrid Inverter System connection Di...

Page 19: ...13 Figure 2 11 For Other Countries Figure 2 12 Power Meter connection diagram Figure 2 13 Acrel Single phase Meter...

Page 20: ...amage and other serious consequence The length of the external cable to the PV side and battery side is suggested to be less than 30m PV array should not be connected to the grounding conductor The mi...

Page 21: ...in the range from 0 C to 50 C The temperature and humidity are maintained at a constant level There is minimal dust and dirt in the area Batteries need to comply with local regulations Suggestion If t...

Page 22: ...herwise it would affect normal operation even cause product damage and serious consequences Both PE ground terminals in the connector and ground point on the enclosure can be earthed simultaneously Do...

Page 23: ...h 6mm Figure 2 19 STEP 2 Measure grid voltage by multimeter ensure grid voltage is less than the high limit of voltage required by all national grid standards STEP 3 Connect connector to AC Load inter...

Page 24: ...late in the accessory into the corresponding interface of the Hybrid Inverter STEP 3 Fix firmly by screw STEP 4 Screw up the water proof cylinder connect the cable from the RS485 interface to the inte...

Page 25: ...19 DRED Power Meter and BMS Connection Figure 2 23 The RJ45 socket pin assignments for DRED Power Meter and BMS as follows Figure 2 24...

Page 26: ...n 75 of rated power AND Source reactive power if capable DRM 4 Increase power consumption subject to constraints from other active DRMs DRM 5 Do not generate power DRM 6 Do not generate at more than 5...

Page 27: ...heck whether the Hybrid Inverter installation is vertical and stable 2 Check that all bolts are tight especially pay attention to the electrical connection whether the flat washers and spring washers...

Page 28: ...thed reliably 5 Check the AC and DC connectors whether are reliably connected 6 Check that the model specifications of the incoming and outgoing cable are correct 7 Check that all cable connections ar...

Page 29: ...Google Play search Sermatec to download 2 iOS User please visit App Store and search Sermatec to download and install 3 Andoriod User please download in Sermatec Official Site https www sermatec ess...

Page 30: ...y showed below Table 4 1 Checking List Checking Sequence Checking Content Checking Standard Remark 1 Check to ensure the condition of DC air switch Switch Off PV BAT 2 Check to ensure the condition of...

Page 31: ...cation STEP 5 Setting other parameters Optional such as Price setting Period setting and etc STEP 6 Click the startup button to power on the inverter STEP 7 Check and observe running data and status o...

Page 32: ...ommand and please refer to Chapter 4 2 b Sequentially disconnects PV side switch Battery side switch PV rotatory switch on the inverter AC grid side switch AC load side switch 5 1 Routine Maintenance...

Page 33: ...Blink System is active and off grid Off System is standby BACK UP On AC Load is active and normal Blink AC Load is active and overload Off AC Load is off SOLAR On All PV is normal Blink One PV is abno...

Page 34: ...AC output circuit ensure PE is grounded well restart after correction 2 If step 1 does not help please contact Sermatec Service team The leakage current of the load exceeds the standard Make sure the...

Page 35: ...age of the grid is lower than the lower limit 1 Check grid voltage and restart the inverter after the grid voltage recover to normal range 2 If step 1 does not help please contact Sermatec Service tea...

Page 36: ...1 does not help please contact Sermatec Service team Reverse PV1 Warning PV1 positive and negative poles reversed connected 1 Check cable connection resume to work when going back to normal If step 1...

Page 37: ...n on when the power grid is normal If it still cannot self recover please contact the Sermatec service team Inverter Damage Battery SOC Lower Than The Lower Limit Error Low Battery SOC 1 Short time fa...

Page 38: ...tage Warning Battery voltage is higher than the upper limit 1 Check battery voltage reduce battery voltage or change battery 2 If step 1 does not help please contact the Sermatec service team Battery...

Page 39: ...ill cannot self recover please contact the Sermatec service team Relay Check Failure Internal relay cannot close or open normally 1 Occasional failures can automatically recover 2 The inverter cannot...

Page 40: ...d series is on our approved battery list 2 Check if you chose the correct battery protocol on the Sermatec Mate App 3 Check battery voltage by using a multimeter ensure it is in correct range 4 BMS ca...

Page 41: ...d turn on If it still cannot self recover please contact the Sermatec service team Bus Level 1 Overvoltage Warning PV overvoltage Decrease number of PV modules or decrease PV open circuit voltage Osci...

Page 42: ...and Eastron sepcial series are supported 2 Check if the communication cable is connected effectively 3 Use a multimeter to check if the socket pins in the communication cable are effective 4 If everyt...

Page 43: ...ng a multimeter ensure it is in correct range 4 BMS cable must be correctly plugged and the wires should be ok can measure by multimeter 5 If everything above is normal please contact the Sermatec ser...

Page 44: ...Maximum charging discharging current A 70 100 BMS communication interface CAN RS485 Reverse polarity protection YES Grid Input Output parameters Grid rated apparent power VA 5000 Grid rated voltage V...

Page 45: ...Europe Efficiency 97 Max Efficiency 97 8 Battery charge discharge efficiency 97 6 96 Power consumption Standby Self consumption W 25 Standard Safety IEC62109 1 2 IEC62040 EMC EN61000 6 1 EN61000 6 2 E...

Page 46: ...0 40 Weight kg 28 Cooling concept Natural cooling Isolation type Transformerless Communication Wi Fi GPRS Optional RS485 Display LED Warranty Years 5 Notes South African grid connection standard 4600w...

Reviews: