
53
15-SETTINGS MENU
Technical Dept. - All rights reserved - Reproduction is prohibited
IDRO STOVE PRINCIPLE DIAGRAMS
The following diagrams are to be used only as a guideline. For proper connection, always follow the notes of the
plumbing and heating installer. The plumbing system must meet local, regional, or national requirements in
force. Installation and verification of operation is to be performed only by specialised, authorised personnel. The
manufacturer will not be held liable for non-compliance with the provisions listed above.
HEATING ONLY CONFIGURATION
CONFIGURATION WITH HEATING AND DOMESTIC HOT WATER
Summary of Contents for MARLENE P/I
Page 1: ...INSTALLATION GUIDE EN PELLET HYDRO STOVE MARLENE P I Instructions in English ...
Page 78: ......
Page 79: ......