C – General Information
C-
2
Reference and Additional Information
For safe, efficient and problem-free operation, it is critical to handle the dehumidifier (as well as related systems
and components) properly at each step - from receiving and storage to installation and start up. Relevant
information can be found in the respective documents (like
Installation Manual
) provided with the dehumidifier.
This manual and other related documents could be obtained from the manufacturer (see
Contact Us
below).
Contact Us
Seresco Technologies website:
http://serescodehumidifiers.com
Seresco Online Service Center website:
http://service.serescodehumidifiers.com
Headquarters
1071 Ages Drive
Ottawa, ON K1G 6L3
Tel: (613) 741-3603
Fax: (613) 680-5301
Customer Support Team
Email:
Phone (US):
(770) 457-3392 ext. 2
Phone (Canada):
(613) 741-3603 ext. 2
Fax:
(613) 680-5301
Attention: Installation and Service Contractors
WARNING!
Any work (installation, start up, service, maintenance, repair, etc.) on any mechanical
equipment (dehumidifier, outdoor condenser, fluid cooler, etc.) must be performed in accordance with
respective manufacturer’s recommendations as well as submittal documentation, local Codes and Regulations,
and appropriate field practices. Failure to do so could result in personal injury, equipment damage or
malfunction, and will void equipment warranty. Only qualified and properly trained individuals should perform
tasks on this equipment.
Attention: Maintenance Team
CAUTION.
To ensure equipment longevity and proper and efficient operation, the dehumidifier and its
auxiliary systems and devices (outdoor condenser, fluid cooler, boiler package, etc.) should be maintained
properly and regularly. Failure to do so could negatively affect premise comfort levels and people’s health. It
could also lead to equipment damage, malfunction, premature tear and ware and may void equipment warranty.
Summary of Contents for CLASSIC NE Series
Page 3: ...B Table of Content B 2 This page is left blank...
Page 11: ...C General Information C 8 This page is left blank...
Page 17: ...D Layout and Components D 6 This page is left blank...
Page 21: ...E Sequence of Operation E 4 This page is left blank...
Page 25: ...F Interface and Communication F 4 This page is left blank...