
SOL-96.110.041 / 290621
TOPAZ Total Alkalinity
Maintenance
41
6.7. Longer Stop of Operation
If the instrument is going to be switched off for a few days or longer,
proceed as follows:
1
Prime the reagent system with deionized water as described in
Stop of Operation for Maintenance, p. 31
2
Clean the photometer thoroughly with diluted hydrochloric acid.
Note:
Do not use a bottle brush, as this could scratch the optics.
3
Remove algae and particles present in sample tubes.
4
Fill the sample tubes and the photometer with deionized water.