
SOL-96.110.041 / 290621
TOPAZ Total Alkalinity
Maintenance
31
6.2. Stop of Operation for Maintenance
Before performing any maintenance work on reagent or pump tubes,
it is recommended to flush the reagent system with deionized water.
Note:
• Before flushing the reagent tubes, make sure that the sample
inlet tap is open.
• To avoid chemical reactions in the photometer, flush the
reagent tubes one after the other, not simultaneously.
Proceed as follows:
1
Remove all reagent tubes from their bottles and place them in a
beaker filled with deionized water.
2
Open the <PUMPS> tab.
3
Press the <ON> button next to “P1 - TAC”.
4
Let the pump run until it stops automatically.
This takes approximately 2.5 minutes.
5
Repeat steps 3–4 with pump “P2 - H2SO4”.
ON
ON
OFF
OFF
P1 - TAC
P2 - H2SO4
ACTUATOR
4-20mA OUTPUT
PUMPS
RELAYS
INPUTS