background image

DA

L  

19

65

Pag. 4/6

M

T

/8

0

/2

 I

 E

!

3-Take the motor out of the metal botton box.

ATTENTION

The motor is fixed on the foundation box by means of two normal nuts, due to problems of 

transport. To install the motor in the system, these two nuts have to be removed and trown away, 
replaced with four self-locking nuts as standard

4-Arrange the founding box at ground level and check the horizontal level and the perfect vertical alignment of the upper 

hinge with the foundation box pin. Check that the distance between the pillar and the centre of the pin is higher than 65 
mm.

The lower hinge -if present- must be removed.

5-The lower hinge -if present- must be removed.

6-Pre-arrange piping for the draining of the rainfall.

7-Cement definitively with concrete.

The connection between the power supply cable of the motor and the cable of the control panel 
has to be carried out outside the foundation box and inside a weather proof housing. On the 
contrary a water infiltration may be occur through the power supply cable causing the motor 
failure.

 GATE  HING

 STIRRUP   WITH UNCLAMPING

 
 ENTRANCE CABLES

1

2

3

WATER DRAIN PIPE WITH SUITABLE 
SLOPE

VERY IMPORTANT

WELL WITH ABUNDANT DRAINAGE FOR 

THE WATER DRAIN

WATER-PROOF CONTAINER WHERE TO 
CARRY OUT ELECTRIC CONNECTIONS

195 

!

THE MINIMUM DISTANCE 
BETWEEN PILLAR AND CENTRE 
OF THE PIN MUST BE 65 mm

!

DRAIN PIPE

Reviews: