1- Install the gate stop blocks, choose the motor position and the opening angle refering to the following shares
see picture 5 :
- Share A: MAX 100mm. The motor could be installed near the pillar if there is a movable hinge, to allow the
motor insertion
- Share B: 30 ÷ 40 mm. In any case keep the parallelism among telescopic arm and the gate-wing.
- Share C: 330 ÷ 340 mm
- The installation of the mechanical end stops for gate opening and closing is necessary for
system safety purposes.
For a correct working and in order to avoid the shearing strictly respect the above mentioned
shares with a tolerance of +10 mm.
1.A- In the event that the
suggested shares
cannot be respected, or for openings exceeding 90°, you have to use
the
long telescopic arm SR93.97
in accordance with the new shares:
- Share A: MAX 150mm
- Share B: MAX 100 mm
- Share C: 430 ÷ 440 mm
ATTENTION:
Using the long telescopic arm, shearing-danger conditions may happen.
ATTENTION:
-
!
DA
L
19
65
Pag. 3/5
TELESCOPIC
ARM
MOTOR
FIXING
BRACKETS
GATE
IMPORTANT:
FEEDER
Fig 4
LONG
SCREW
!
FOUNDATION BOX
FOR THE MOTOR
SPACING TUBE TO BE INSERETED
ON THE FOUNDATION BOX BEFORE
THE CEMENTING PHASE
SPACING SHEET TO BE INSERTED
ON THE FOUNDATION BOX BEFORE
THE CEMENTING PHASE
LONG
SCREW
ATTENTION:
FOR LIFTING THE MOTOR FROM THE
FOUNDATION BOX, TAKE OUT TWO
STANDARD SCREWS AND FIX TWO
LONG SCREWS IN THEIR PLACE.