4) INSTALLATION OF THE GEARED MOTOR
- After the concrete has solidified, loosen the nuts A
and unscrew the screws F (Picture 3).
- Unscrew the two side screws V and remove the
casing (Picture 4).
- Fasten the geared motor to the base plate PM/13
through the screws F after removing the nuts A. Take
care to put some distance washers S, 2 mm thick, (2
pieces each screw) between the base plate and the
base of the geared motor in order to adjust the gap
between the pinion and the rack (Picture 4).
3) FIXING OF THE BASE PLATE
- Prepare an excavation where to cement the geared
motor base plate PM/13.
- Place the base plate PM/13 respecting the spaces as
shown in the pictures 3÷3a (we advise you to let it jut
out about 50 mm from the ground).
- The base where to fix the base plate should be clean
and perfectly parallel to the ground.
- Prepare some flexible tubes for the passing of the
electric feeders making them pass through the hole of
the base plate (Picture 3a).
2) SETTING OF THE BASE PLATE PM/13 FOR THE
FIXING OF THE GEARED MOTOR:
Insert the nut C in the 4 holes of the base plate B.
- Screw the tie-rod E to the nut C until it stops, Picture 2.
-
- Screw the nuts A to the screws F, Picture 2.
- Screw the screws F so pieced together to the nuts C
and lock the base plate B tightening the nuts A, Picture
2. Repeat the operation for the other holes of the base
plate PM/13.
- Bend downwards the preformed rag bolts Z by means
of a hammer or some pliers until you get an angle a <
90°, Picture 3.
1) BEFORE BEGINNING THE INSTALLATION OF THE
GEARED MOTOR
- Check that the gate is provided with a rugged rail.
- Check that the rail is well fixed in the ground.
- Check that some rugged stop blocks are fixed at the
further ends of the rail.
- Check the perfect smoothness of the gate.
The installation of the mechanical end stops
for gate opening and closure is necessary for
system safety purposes and therefore this
operation must be performed before
proceeding with the installation of the control
unit.
NUT M10 TO BE USED JUST FOR THE TIGHTENING OF
THE BASE PLATE DURING THE CEMENTATION PHASE
BASE PLATE
TUBE FOR THE PASSING
OF FEEDERS
RACK
GATE
HOLE FOR THE
FEEDER ENTRY
STOP BLOCK
BASE PLATE PM/13
HOLE THAT HAS NOT TO BE
USED FOR THE FEEDER ENTRY
BASE PLATE
KI
T/
18
F-
18
H-
25
H
I
E