38
Two examples have been developed to demonstrate the conversion.
Case I
is
for a sealed room, with no air turnover.
Case II
is for a room with a known air
turnover.
Case I:
Sealed room 40 ft x 30 ft x
10 ft high
1. How much R-22 (in lbs) is
necessary to cause a measurement
of 25 ppm?
Given 25 ppm R-22 in the sealed
room:
Volume of R-22 = parts per million / million x room
volume
R(cuft) = [25(ppm)/1,000,000] x [40 x 30 x 10](cuft)
R(cuft) = .3 cuft of R-22 in the sealed room
Given .3 cuft R-22, calculate weight
in lbs:
Weight = volume(cuft) x density(lb/cuft)
Weight = R(cuft) x RD22(lb/cuft)
Weight = .3(cuft) x .22(lb/cuft)
Weight = .066 lbs
2. If the leak rate is 300 lb/yr, how
long will it take to reach 25 ppm?
Given the same refrigerant in the
same room, 25 ppm weighs .066 lbs:
Time(hr) = weight of R-22(lb) / [weight(lb)/time(yr)] x
[time(hr)/time(yr)]
Time(hr) = .066(lb) / [300(lb)/1(yr)] x [8760(hr)/1(yr)]
Time(hr) = 1.93 hrs
Case II:
40 ft x 30 ft x 10 ft high
room with fresh air makeup of 100
cfm
1. How much R-22 (in lbs/yr) is
necessary to cause a measurement
of 25 ppm?
Given air turnover of 100cfm,
calculate the fresh air volume in
cuft/hr:
Air flow (cuft/hr) = air flow (cfm) x [60(min)/1(hr)]
Air flow(cuft/hr) = 100cfm x 60 min/hr = 6000 cuft/hr
Given 6000 cuft/hr, calculate the leak
rate that is required to
maintain
a
measurement of 25 ppm:
Leak rate min (cuft/hr) = parts per million/million x fresh
volume(cuft/hr)
Leak rate min (cuft/hr) = [25(ppm)/1.000.000] x
6000(cuft/hr)
Leak rate min(cuft/hr) = .15 cuft/hr
Given .15 cuft/hr, calculate the leak
rate in lb/yr needed to
reach
25 ppm:
Leak rate(lb/yr) = leak rate(cuft/hr) x density(lb/cuft) x
[8760(hr) / 1(yr)]
Leak rate(lb/yr) = .15(cuft/hr) x .22(lb/cuft) x 8760(hr/yr)
Leak rate(lb/yr) = 289 lb/yr, therefore the leak rate must
be
GREATER THAN 289 lb/yr
.
2. If the leak rate is 500 lb/yr, how
long will it take to reach 25 ppm?
Calculate LR in cuft/hr:
LR(cuft/hr) = [leak rate(lb/yr) / density(lb/cuft)] /
8760(hr/yr)
LR(cuft/yr) = 500(lb/yr) / .22(lb/cuft) / 8760(hr/yr)
LR(cuft/yr) = .26 cuft/hr
Calculate time in hr:
Time(hr) = [Room volume(cuft)/Air flow(cuft/hr)] x
ln[LR(cuft/hr) / [LR(cuft/hr) – Leak rate min(cuft/hr)]]
Time(hr) = [12000(cuft)/6000(cuft/hr)] x
ln[.26(cuft/hr)/[.26(cuft/hr)-.15(cuft/hr)]
Time(hr) = 2(hr) x ln[2.3636]
Time(hr) = 1.72 hr
Summary of Contents for IR-SNIF-1
Page 50: ...47 05 20 2008 ...