ENGLISH 3/8
MI004640-E
The module is designed to be installed in vertical position on a DIN 46277 rail. In order to
ensure optimum performance and the longest working life, the module(s) must be supplied
adequate ventilation and no raceways or other objects that obstruct the ventilation slots.
Never install modules above sources of heat; we recommend installation in the lower part of
the control panel.
INSTALLATION AND CONNECTIONS
Antenna
Power
supply
RS 232
IDC10
Screw term.
RS 485
IDC10
Screw
term.
RJ10
Screw
term.
COM
1500V
isolations
Standards:
Storage
:
The Z-LINK1 complies with the following standards:
ETSI EN 300 220-2 V2.1.2 (2007-06)
ETSI EN 301 489-3 V1.4.1 (2002-08)
CEI EN 60950
Radio Equipement Device 2014/53/EU (RED)
-25
–
+85 °C
Functioning :
0
–
+55 °C
Connections
:
2
-Removable screw terminals:conductors up to 2.5 mm
-RJ10 connector for RS232 serial port
-JACK stereo connector for programming
-SMA connector for antenna
-IDC10 connector for Seneca bus
Humidity
:
20
–
85 % (
without condensing
)
Mounting:
For DIN
rail
IEC EN 60715
Dimensions, weight :
100 x 112 x 17,5 mm, 200 g.
Case :
PA6, black
Accessories :
Cable: RJ10/DB9F (PM001420)
Directional antenna - 2.5 m - SMA (ANT-MAG)
Seneca bus accessories: Z-PC-DIN
Thermo-mechanical features