6
Carriage bolt
1 / 4 - 20 x 0.750”
(2 pieces)
1 / 4 - 20 Kept nuts
(2 pieces)
1 / 4 - 20 Kept nuts
(4 pieces)
8-32 x 11/32” Kept nuts
(3 pieces)
Taken from Vend Station
1 / 4 - 20 x 1.000”
Screw (2 pieces)
Carriage bolt
1 / 4 - 20 x 0.500”
(4 pieces)
9900X
ST2
Installing your Vend Station
Installing your Copies & Prints Vend Station does not require any specialized
skills or tools. The 9900X is too heavy to be attached directly onto a copier
like before. Only three options are available. You can either install it on the
ST2 Floor Stand, the FL2 Protective Cage, or directly on a wall.
To install it on the ST2:
1. Put the cabinet lying down on the floor (be careful not to damage the
Lexan + there should be no change in the coin changer's tubes).
2. Remove the harnesses (power & communication) from the loops.
3. Unscrew all three 8-32 11/32" nuts. Keep them aside.
4. Remove the back plate of the pedestal.
5. Pass the harnesses in the square hole starting with the power cord and
transformer followed by the copier harness.
6. Place cabinet on top of the ST2 floor stand.
7. Pass the four ¼ x 20 carriage bolts included with the floor stand in their
respective holes.
8. Re-install the harness loop with its cables.
9. Re-install the three 8-32 11/32 nuts.
10. Tighten all nuts (8-32 & ¼ x 20)
11. Reinstall the back plate removed at step #4.
12. The floor stand can be anchored in the floor for added security.
Summary of Contents for 9900X
Page 1: ...www sem ca April 2017 Part i01081 Version 3 7...
Page 36: ...36...