SEM Paper Shredders Operator Manual
2
SEM | www.semshred.com
Setup
Install the shredder on a level surface, away from heat sources and direct sunlight.
Once unpacked, the cutting head will need to be placed onto the unit. It is
recommended that two people lift the cutting head onto the unit.
Use caution and follow procedures when placing the cutting head on top of the
unit to avoid injury.
Note
: All machines have a container inside the cabinet along with a small supply of
plastic bags.
Shredders with an Auto Oiler
Units that have an auto-oiler will need to be set up prior to running.
1. Take the oiler holder out of the cabinet and hook it into the side of the cabinet (A).
2. Remove the lid from the oiler (B).
3. Remove the plastic bag from the oil tube (C).
4. Put the oil tube into the oiler and screw on the cover (D).
Once the oil is firmly secured and on the machine, plug the unit into the wall.
Summary of Contents for 2226 Series
Page 2: ......