TUNNEL SPIDER
29
Before starting a maintenance procedure the safety
officer must:
1) Clear the working area of extraneous materials
and people.
2) Make sure that the necessary tools are
conveniently available to the maintenance
technician and that they are in good condition.
3) Make sure that the lighting is sufficient and
provide, if necessary, portable low voltage lights.
4) Make sure that the maintenance technician is
equipped with the necessary approved personal
protection equipment for the specific operation
(gloves, safety glasses, shoes, etc.).
5) Make sure that the maintenance technician has
carefully read the instructions contained in this
manual and has excellent knowledge of how the
machine works.
At the end of every maintenance intervention the
following procedures need to be carried out before
restarting the machine:
6)
Carefully clean the floor in the work area,
removing any residues that may cause
slippage
7)
Lock the protective panels back into place,
check the functionality of the interlocking parts
and of the safety devices. Make sure to re-
activate
them
if
they
were
previously
deactivated
8)
Make sure that no extraneous components
have been left in the machine, especially
mechanical parts, utensils or components used
for maintenance that could cause damage to
the machine or put personnel at risk.
9)
Before switching the machine back on make
sure that all personnel are at a safety distance.
10) Before
restarting
the
processing,
the
maintenance technician must check the entire
working cycle, the functionality of the safety
mechanisms and the integrity of the fixed
protective panels.
11) before restarting the working cycle the machine
must be cleaned according to the instructions in
section 6.3.
Attention
Following every maintenance intervention it is
the Safety Officer duty to ascertain that the
machine is working properly and that all the
safety devices are present and functional.
Unless expressly required for the solution of a
breakdown, never interfere with the adjustments and
positioning of the limit microswitches; their tempering
can cause serious damage to the machine and pose
risks to the operator.
Before assembling a block always cover with a thin
layer of alimentary grade oil the internal parts and
coupled surfaces. replace all the seals and gaskets
with original parts before reassembling the
components.
Note
Before reinstalling the machine components
that have been washed with water or other
liquids, check that they are completely
dry.
Work on electrical components must only be carried
out by the electrical maintenance technician
specially trained and authorized by the Safety
Officer.
Summary of Contents for SPIDER
Page 1: ...A ...
Page 2: ...TUNNEL SPIDER B ...
Page 7: ...TUNNEL SPIDER 3 1 2 3 4 5 7 6 8 ...
Page 12: ...TUNNEL SPIDER 8 Electronic Board ...
Page 30: ...TUNNEL SPIDER 26 Configuration SPIDER MOULD LOADER 175 ...
Page 37: ...TUNNEL SPIDER 33 7 ELECTRICAL DIAGRAMS ...
Page 38: ...TUNNEL SPIDER 34 ...
Page 39: ...TUNNEL SPIDER 35 ...
Page 40: ...TUNNEL SPIDER 36 ...
Page 41: ...TUNNEL SPIDER 37 ...
Page 42: ...TUNNEL SPIDER 38 ...
Page 43: ...TUNNEL SPIDER 39 ...
Page 44: ...TUNNEL SPIDER 40 ...
Page 45: ...TUNNEL SPIDER 41 ...
Page 46: ...TUNNEL SPIDER 42 ...
Page 47: ...TUNNEL SPIDER 43 ...
Page 48: ...TUNNEL SPIDER 44 ...
Page 49: ...TUNNEL SPIDER 45 ...
Page 50: ...TUNNEL SPIDER 46 ...
Page 51: ...TUNNEL SPIDER 47 ...
Page 52: ...TUNNEL SPIDER 48 ...
Page 53: ...TUNNEL SPIDER 49 ...
Page 54: ...TUNNEL SPIDER 50 ...
Page 55: ...TUNNEL SPIDER 51 ...