7 D * * T e c h n i c a l I n s t r u c t i o n
No.1
No. PROSESS
ILLUSTRATIONS
AND
SPECIAL INSTRUCTIONS
Assembling the
switching unit
91
Set the main plate.
↓
90
Set the lead pin for
RZ1.
↓
89
Set the hour and
minute stator.
↓
88
Set the second
stator.
↓
87
Set the generating
stator.
↓
86
Set the
rechargeable
battery connection
(+).
↓
85
Set the 1
st
intermediate wheel
for calendar
corrector.
↓
84
Set the clutch
wheel.
<90> Set the lead pin for RZ1.
*Ensure that the lead pin for RZ1 is tightly
mounted without any clearance.
<89> Set the hour and minute
stator.
* When mounting, take care not to
distort or deform the hour and
minute stator.
(To prevent deterioration of the
motor.)
<88> Set the second stator.
* When mounting, take care not to distort
or deform the second stator.
(To prevent deterioration of the motor)
<87> Set the generating stator.
*Distinction from the
5J
-series
counterpart
See the red-circled parts, which
are shaped to identify the
7J-series generating stator.
*When mounting, take care not to
distort or deform the generating
stator. (To prevent deterioration
of electric power generation)
<86> Set the rechargeable battery
connection (+).
<85> Set the 1st intermediate wheel
for calendar corrector.
<84> Set the clutch wheel.
<91> Set the main plate.