background image

 

 

 

                            SEI Industries Ltd. 7400 Wilson Avenue, Delta, B.C. Canada V4G 1H3 

 

                        T: 604.946.3131     

[email protected]

     

www.sei-ind.com

 

 

Page 1 of 2 

Technical

 

Bulletin

 

Date:

 

June

 

1,

 

2015

 

Product

 

Line:

 

Bambi

 

Models:

 

Bambi

 

Max

 

Subject:

 

IVC

 

cable

 

installation

 

Background

 

Older

 

Bambi

 

Max

 

manuals

 

instruct

 

operators

 

to

 

fasten

 

the

 

IVC

 

power

 

cable

 

to

 

the

 

IDS

 

hub

 

and

 

deployment

 

cable

 

using

 

zip

ties.

 

Operators

 

are

 

instructed

 

to

 

provide

 

some

 

slack

 

during

 

installation.

 

Despite

 

this,

 

SEI

 

has

 

observed

 

incidences

 

of

 

the

 

power

 

cable

 

being

 

pulled

 

from

 

the

 

strain

 

relief

 

on

 

the

 

IVC,

 

resulting

 

in

 

water

 

ingress.

 

The

 

zip

tie

 

may

 

gradually

 

work

 

along

 

the

 

power

 

cable

 

over

 

time

 

and

 

eliminate

 

slack.

  

Recommendations

 

SEI

 

recommends

 

that

 

operators

 

avoid

 

fastening

 

the

 

power

 

cable

 

to

 

the

 

IDS

 

or

 

IDS

 

deployment

 

cable

 

all

 

together.

 

Instead

 

the

 

operators

 

should

 

fasten

 

the

 

cable

 

directly

 

to

 

the

 

bucket

 

head

 

with

 

4

 

zip

ties

 

as

 

illustrated

 

in

 

Figure

 

1.

 

Operators

 

must

 

ensure

 

that

 

there

 

is

 

at

 

least

 

6”

 

of

 

slack

 

in

 

the

 

line.

 

It

 

is

 

recommended

 

that

 

operators

 

quickly

 

check

 

that

 

there

 

is

 

adequate

 

slack

 

in

 

the

 

line

 

before

 

flight.

 

New

 

buckets

 

will

 

already

 

have

 

the

 

installation

 

shown

 

in

 

Figure

 

1.

 

Reviews: