57
5.2.9.2.OUTPUT TEST
Select OUTPUT TEST to display the following screen and check the status of each lamp.
This test should be used periodically to check that the lamps are functioning correctly.
OUTPUT TEST Screen
Select the item to be tested. If the connections are functioning correctly, the “1P” and “2P” buttons will flash
when PLAYER 1 and PLAYER 2 are selected.
Move the cursor to EXIT and press the TEST Button to return to the Game Test Menu screen.
Summary of Contents for The Maze of the Kings
Page 30: ...27...
Page 34: ...31 3 14 COMPOSITION OF THE GAME BOARD...
Page 50: ...47 5 2 2 JVS TEST...
Page 77: ...74 8 5 SPX 1000UK ASSY PTV CABI DX...
Page 92: ...LOCATE A3 SCHEMATIC DRAWING 1 HERE...