10
3.7. ASSEMBLY
INSTRUCTIONS
·
Perform the assembly by following the procedure herein stated. Failure to comply
with the instructions, for example, inserting the plug into an outlet at a stage not
mentioned in this manual can cause an electric shock
·
Assembling should be performed as per this manual. Since this is a complex
machine, erroneous assembling can cause damage to the machine, or
malfunction to occur.
·
Do not attempt to complete this work alone, a minimum of 2 people are required.
·
Only QUALIFIED SERVICE PERSONNEL should carry out assembly.
When carrying out the assembly work, follow the procedure in the following sequence:
STEP 1: ASSEMBLE THE MACHINE
STEP 2: LEG-LEVELLING PROCEDURE
STEP 3: COIN HANDLING INSTALLATION.
STEP 4: CONNECTION TO THE POWER SUPPLY
STEP 5: ASSEMBLY CHECK
Note that the parts contained within the installation kit are required for the assembly work.
·
Fit all fixings loosely first as detailed in step 1, then position all components before
finally tightening fixings at step 4.
Summary of Contents for The Maze of the Kings
Page 30: ...27...
Page 34: ...31 3 14 COMPOSITION OF THE GAME BOARD...
Page 50: ...47 5 2 2 JVS TEST...
Page 77: ...74 8 5 SPX 1000UK ASSY PTV CABI DX...
Page 92: ...LOCATE A3 SCHEMATIC DRAWING 1 HERE...