Check the network connection.
The test will begin as soon as this screen is displayed. The machine cannot be operated until the test is finished.
■ NETWORK TEST Screen
The following information is displayed on this screen.
The status of determining items is as listed in the table below:
Press the TEST Button to return to the NETWORK SETTING (Setting Menu) screen.
5-12 EXIT
Exit the Test Mode.
CHECK
Indicates that the item is currently being checked.
GOOD
Indicates that the item is functioning normally.
BAD
I n d i c a t e s t h a t t h e i t e m i s n o t f u n c t i o n i n g n o r m a l l y .
(Damaged, incorrect settings, etc.)
N/A
I n d i c a t e s t h a t t h e i t e m h a s n o t b e e n c h e c k e d .
(Prerequisites have not been met, etc.)
DHCP
Status of communication settings acquisition when DHCP is set to ENABLE.
LOOPBACK
RINGWIDE network function operation status.
LINKUP
LAN cable connection status.
GATEWAY
Status of connection with title router, etc.
ROUTER
Status of connection with ALL.Net router.
HOPS
Number of router connections to ALL.Net router.
SERVER
Status of connection with ALL.Net server.
NETWORK TEST
DHCP ------------ ****
LOOPBACK -------- ****
LINKUP ---------- ****
GATEWAY --------- ****
ROUTER ---------- ****
HOPS
*
SERVER ---------- ****
PRESS TEST BUTTON TO EXIT
NETWORK TEST
Summary of Contents for TARGET BRAVO
Page 7: ......
Page 62: ...STERLING PRICE OF PLAY SETTINGS SW1...
Page 63: ...EURO PRICE OF PLAY SETTINGS SW1...
Page 90: ...12 DESIGN RELATED PARTS...
Page 93: ...ASSY CONTROLLER GST 2100 D 1 2...
Page 99: ......
Page 100: ......