6
PRECAUTIONS REGARDING INSTALLATION LOCATION
2
FIG. 2 Installation and operation area (cm)
2-2 OPERATION AREA
● For the operation of this machine, secure a minimum area of 2.94 m (W) x 3.96
m (D). If the machine rolls during play it could lead to serious injury, especially
if anyone is hit on the head. You must secure the space specified in this docu-
ment.
● Be sure to provide sufficient space specified in this manual. Do not allow ob-
jects to block the ventilation ports. It can cause generation of heat and a fire.
● SEGA shall not be held responsible for damage or compensation for damage
to a third party, resulting from the failure to observe this instruction.
● If the machine does not fit through the entryway to the installation location, do
not disassemble it without first consulting the instructions. If the machine still
does not fit through the entryway after following the procedures in this manual,
contact your retailer or the office listed in this manual.
To install this product, the entrance must be at least 1.20 m in width and 1.90 m in
height.
Summary of Contents for GHOST SQUAD - EVOLUTION
Page 60: ...EXPLANATION OF TEST AND DATA DISPLAY 55 9 FIG 9 3a02 Controller...
Page 87: ...82 COIN SELECTOR CREDIT SETTINGS 12 PRICE OF PLAY SETTINGS FOR UK...
Page 88: ...COIN SELECTOR CREDIT SETTINGS 83 12 PRICE OF PLAY SETTINGS FOR EURO...
Page 101: ...96 PARTS LIST 18 1 TOP ASSY GE DX GE 0000UK D 1 2...
Page 103: ...98 PARTS LIST 18 2 ASSY PTV GE 0500UK D 1 2 SORRY BUT NO IMAGE AT TIME OF PRINT...
Page 105: ...100 PARTS LIST 18 3 ASSY CABINET DX GE 1000UK D 1 2...
Page 107: ...102 PARTS LIST 18 4 ASSY BILLBOARD GE 0550UK D1 2...
Page 110: ...PARTS LIST 105 18 6 ASSY PTV BASE GE 0650UK...
Page 116: ...PARTS LIST 111 18 11 ASSY SUB CABI DX GE 1100UK D1 2...
Page 119: ...114 PARTS LIST 18 13 ASSY HOLDER LIGHT GE 1340UK D1 2...
Page 123: ...118 PARTS LIST 18 16 ASSY CONTROL UNIT CTF 2100 D1 2...
Page 129: ...124...
Page 131: ......
Page 132: ......
Page 133: ......