CW3 INDIRECT COOLER INSTALLATION MANUAL | 7
INSTALLATION
Model
Shipping Weight
Operating Weight
CW3
175 kg
(385 lb)
210 kg
(465 lb)
ASSESSMENT OF ROOF STRUCTURE
THE COOLER REQUIRES AN ADEQUATE ROOF
STRUCTURE TO BEAR THE LOAD OF ITS OPERATING
WEIGHT. IT IS LIKELY THAT MOST RESIDENTIAL
STRUCTURES WILL REQUIRE REINFORCEMENT.
Engineering designs of roofs, including the supporting
structure and cladding, should take into account whether the
work practices necessary to carry out the installation and
maintenance on the roof can be carried out safely.
It is the installers responsibility to verify the integrity of the roof
structure as well as determine and implement an adequate load
bearing structure to which the dropper and cooler is fixed. The
roof structure in question must be in good condition (i.e. no worn
members or pre-existing damage) and compliant with one of the
structurally engineered roof mounting schemes provided (Refer
to Appendix A):
If these generic schemes are not applicable to the customer
installation, it is the installer’s responsibility to seek the services
of a structural engineer or certified builder to ensure that the
installation is adequate and complies with local and national
building codes. Installation on inadequate structures will void
the warranty and could result in death or serious injury. If the
installer has any doubt in regards to the structural integrity or
condition of the customer installation, then a structural engineer
or building certifier must be consulted.
ILL2773-B
To correctly unpackage the cooler, follow the instructions below:
1. Inspect for transport damage prior to unpacking.
2.
Remove the plastic film, polystyrene foam packing blocks
and pallet strapping. Dispose of responsibly.
3. Remove the top horizontal timber support members and
vertical timber support members. Dispose of responsibly.
4. Leave the base pallet and foam supporting blocks in
position in 3 places, as shown. These are required for lifting.
UNPACKING THE COOLER
The cooler will be delivered on a dedicated pallet and will
be wrapped in plastic film with timber and foam supporting
members.
The cooler will be accompanied by a packout kit box containing
control items and other components that are required for
installation.
ILL2772-A
ILL2772-A
ILL2773-B
MOVING THE COOLER
The cooler can be moved either by fork-truck or pallet-truck
whilst it is resting on its dedicated pallet. Do not drag or lift the
cooler unless it is on its dedicated pallet.
ILL2970-B
ILL2970-B
1
2
3