
36 |
APPENDICES
Transport all 8 manifold assemblies to the roof and fit to the
cooler. To do this, carefully slide the manifolds into the plenum
outer ensuring a tight fit with no gaps between the interfacing
surfaces. All manifold assemblies should mate firmly with the
plenum outer to form a good sealing face. Handle the manifolds
with care. Excessive force may damage the foam and/or
manifold assembly.
ILL3127-A
Secure the manifold assemblies by pulling and locking the lower
and upper manifold retention straps into the dedicated slots on
the manifolds.
ILL2814-A
Reconnect the vertical hose pillars to the hose restraint clips on
the foam plenums.
ILL2815-A
Loosely constrain the cables in the plenum area to the cable tie
mount on the plenum.
Adjust the cable routing runs and neaten up the cable runs in
the tank. Re-fit cable ties to constrain the cables such that they
are suspended above the water.
Refit the electronics cable cover and screw to the plenum.
ILL3127-A
Route the top motor cables down to the electronics enclosure
via the cable restraint built into the foam plenum that is closest
to the drain valve (i.e. the right hand side foam plenum when
facing the front of the cooler). Reconnect the cables according
to the corresponding labels. Refer to the wiring diagram shown
in “Removing the Top Motor/Fan Assembly:” on page 32.
Reinstall all 8 manifold retention straps onto the top motor/fan
assembly. Slide the ring end over the spigot. Stretch the strap
so that the head of the strap pulls back against the manifold to
retain it.
APPENDIX – B ‘PIECE BY PIECE’ INSTALLATION