
ZEBRA-9.30, ZEBRA-9.30.BT
21
27.01.2021
1 - post; 2- plastic plug; 3- holes to enter the cable inside the post; 4- holes to enter the
main cable and the sensor cable; 5- holes to enter the main cable; 6- concrete (gravel);
7- rebars to prevent an unauthorized demounting; 8- ground.
Note
1 At size A, lay the ground after the installation.
2 Dimensions are given in mm.
Figure 2.1 – Installation of posts
2.3.2.6
Lay the main cable in accordance with the project for the alarm system.