background image

Installation   and   Commissioning   of   the   Secabo   TB7   on   a   
Secabo   heat   press   

 

 

 

Make   sure   that   the   Base   Frame   of   the   Secabo   heat   press   is   on   a   stable   table.    

  

Remove   the   base   plate   of   your   Secabo   heat   press   in   the   first   step.   

 

Place   the   TB7   on   the   base   of   the   Secabo   heat   press.   

 

Fix   the   TB7   to   the   base   of   the   Secabo   heat   press   from   below   using   the   two   screws   
provided.    

  

Alternatively,   you   can   also   mount   the   TB7   on   the   Secabo   quick-change   system   or   the   
Secabo   Slide   extension.    

  

Place   the   table   holder   for   the   controller   box   on   a   flat   surface   near   the   TB7   and   mount   the   
controller   box   in   it.   

 

Attach   the   large   5-pin   plug   from   the   bottom   of   the   TB7   to   the   matching   socket   on   the   
outside   right   of   the   controller   box.   (the   other   small   6-pin   socket   remains   free)   

 

Plug   in   the   supplied   C13   power   cord   at   the   rear   of   the   controller   box   and   connect   it   to   a   
shock-proof   socket,   which   must   have   a   grounded   connection,   a   fuse   and   an   earth   leakage   
circuit   breaker.   

 

● The   Secabo   Thermobase   TB7   is   now   ready   for   operation.   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Secabo   GmbH     Hochstatt   6-8     85283   Wolnzach     Germany     [email protected]     www.secabo.com   

 

Summary of Contents for TB7

Page 1: ...your device Any form of reproduction of these operating instructions requires the written permission of Secabo GmbH Technical data and product features are subject to change without notice Secabo Gmb...

Page 2: ...en the TB7 and the corresponding controller and do not make any changes to both components yourself Should it be necessary to open the heat plate cover upon explicit request by Secabo s customer servi...

Page 3: ...le f Secabo TC Smart Base not part of the delivery contents just as an example Technical data Brand Secabo Work surface size 40 x 50 cm max temperature 220 C Power supply Wechselspannung 230V 50Hz 60H...

Page 4: ...Items included Heating plate with silicone mat and coating Secabo GmbH Hochstatt 6 8 85283 Wolnzach Germany mail secabo com www secabo com Controller Box with table holder C13 Cold device cable...

Page 5: ...or the Secabo Slide extension Place the table holder for the controller box on a flat surface near the TB7 and mount the controller box in it Attach the large 5 pin plug from the bottom of the TB7 to...

Page 6: ...Display components and their meaning Secabo GmbH Hochstatt 6 8 85283 Wolnzach Germany mail secabo com www secabo com Area for time setting and countdown when press is closed irrelevant for the TB7 ti...

Page 7: ...3 Wolnzach Germany mail secabo com www secabo com Area for time setting and activity indicator of the pre press feature irrelevant for the TB7 time is controlled by the heat press Icon for the Bluetoo...

Page 8: ...scrolls across the display for 3s instead of the current temperature is activated when the CURRENT temperature corresponds with the TARGET temperature allowing for a certain deviation of X Arrow up is...

Page 9: ...mode ends automatically Pressing will exit the input mode the display will return to its original value Pre pressing can be activated permanently from the settings menu More information below Saving t...

Page 10: ...tooth 3 Bluetooth PIN for TB7 please deactivate do not use You can use the rotary knob to save your individual PIN which the app will then prompt you to enter The default PIN from factory is 255 which...

Page 11: ...rolled by the heat press Press the button for 2s display flashes briefly values are set to 0 Second setting tier for operational key figures and service Press and hold the Settings button to enter the...

Page 12: ...work should be carried out with the press switched off and cooled down The plug must first be removed from the socket Carry out maintenance work only after consultation with our technical support The...

Page 13: ...inishing processes After the press operation garments must cool off before any carrier media can be pulled off the transfer material The hot glue in the transfer material doesn t develop its adhesive...

Page 14: ...ns of the following EC Directives and Harmonized Standards EG Richtlinien EC Directives 2014 35 FG Niederlassungsrichtlinien 2014 35 EC Low Voltage Directive 98 37 EG Maschinenrichtlinie 2006 42 EG ab...

Reviews: