SmartEAR installing and programming
31
The installation wizard leads to the installation step
Transmission test
.
Here you can test the communication chain between SmartEAR logger and
POSEYEDON Cloud.
Proceed as follows:
Step Description
1
Tap the Start button
bottom right.
Result:
The screen lists the individual steps of the test.
Successfully completed steps receive a green tick.
Steps that have not been completed successfully receive a red
exclamation mark.
Tap the Info symbol
of the relevant step to get more information about
the error occurred.
2
The test ends automatically as soon as all listed steps have been completed.
If you want to stop the test beforehand, tap the Stop button
bottom right.
Using the Refresh button
bottom left you can repeat the test.
The arrow button
bottom right takes you to the next installation step.
Next step Schritt