33
CRACK PRO® MASTIC MACHINE
OPERATING INSTRUCTIONS
APPLICATION OF MATERIAL
7.
Once the material in the tank is completely melted and
the desired application temperature is reached, it is time
to fill cracks.
8.
The transfer oil temperature controller should be set for
500°F.
9.
The material temperature controller should be set for
300°F - 400°F Depending on material
.
See the temperature control page for instructions on how to set the controllers.
TOOL HEATER BOX
10.
The Tool Heater Box, is equipped with a 5min. auto
off timer so you don’t forget to turn it off while working.
11.
It also has a full on timer for the jobs that require
all day tool heating.
Summary of Contents for Crack Pro 250
Page 1: ......
Page 8: ...8 SAFETY PRECAUTIONS AND CAUTIONS FIRST AID ...
Page 20: ...20 ...
Page 21: ...21 ...
Page 22: ...22 ...
Page 23: ...23 ...
Page 24: ...24 ...
Page 25: ...25 ...
Page 26: ...26 ...
Page 27: ...27 ...
Page 37: ...37 WIRING DIAGRAMS TEMPERATURE CONTROL BOX ...
Page 38: ...38 WIRING DIAGRAMS TEMPERATURE CONTROL BOX ...
Page 39: ...39 MASTIC MACHINE CONNECTOR J1 ...
Page 41: ...41 WIRING DIAGRAMS ALL THE WIRING COMES OUT OF THE CONTROL BOX TO THE LIGHTS ...